Attachment #1 to Change Order #3
VENDOR CONTRACT #B99983
10/1/99 through 9/30/00
ADVANCED LASER SOLUTIONS
721 Kirkland AVE
Kirkland, WA 98003
TEL: 425-822-4400
FAX: 425-889-6491
Contact Person: April Lancaster
REMANUFACTURED TONER CARTRIDGES
Description / PriceEP CARTRIDGES - (92285A) - HP Laserjet, Laserjet Plus, Apple Laserwriter, Laserwriter Plus, Ultra-Black Toner / $44.50
EPS CARTRIDGES - (92295A) - HP Laserjet II & III, Apple Laserjet II, NT, NTX, SC, Ultra-Black Toner / $44.50
EPL CARTRIDGES - (92275A) - HP Series IIP & IIIP, Apple Personal Laserwriter NT, Ultra-Black Toner / $44.50
EPN CARTRIDGES - (92291A) - HP III/IVSI, Canon LBPNX, Wang LDP17, QMSPS 1700, Ultra-Black Toner / $76.50
LASERJET 4 - (92298a) - hp Laserjet 4, HP Laserjet 4M, HP Laserjet 4 Plus, Ultra-Black Toner / $76.50
LASERJET 4L - (92274a) - HP Laserjet 4L, HP Laserjet 4P,
Ultra-Black Toner / $44.50
LASERJET 4MV - (c3900a) - HP Laserjet 4MV, HP Laserjet 4V,
Ultra-Black Toner / $99.00
COMPAQ PAGE MARQ / $195.00
NO1 / $44.50
IBM 4019 / $109.00
NEC / $99.00
RICOH FAX / $49.00
INK JET 51626A (Refill) / $18.00
CANON FX1 (Fax) / $44.50
Above pricing based on cartridge exchange. Please add $5.00 if exchange cartridge is not available.
PLEASE NOTE: In order to maintain the Advanced Laser Solutions' standard of excellence, we install Long-Life drums in all cartridges, with the exception of the EP cartridge, Compact Page Mark, NO1, IBM 4019, NEC, Ricoh, & Ink Jet. There is a one-time fee of $25.00, then we replace drums as needed free of charge.
LASER PRINTER CLEANINGS
This service consists of a deep cleaning and evaluation.
1 - 5 printers$35.00 per printer
6 - 20 printers$29.95 per printer
21 - Plus Printers$24.95 per printer
Ozone Filer$15.95 each
LASER PRINTER SERVICE
$70.00 Per Hour
$25.00 trip charge
One hour minimum
PREVENTATIVE MAINTENANCE PROGRAM
Prevent 14Basic1 - 9 printers $194.00 per machine
Basic10+ printers$183.00 per machine
Our basic service is a 14 step process that results in a complete overhaul of your laser printer. In addition to the maintenance service, your fuser roller assembly is warranted for one full year, parts and labor. Additionally, we will include one interim printer cleaning to insure maximum printer performance.
Prevent 14Plus1 - 9 printers$234.00 per machine
Plus10+ printers$223.00 per machine
Prevent 14 Plus includes the Basic Prevent 14 service, fuser roller warranty and printer cleaning. You pay only the next $100.00 of any and all printer repairs (excluding the warranted fuser roller assembly) during the next 12 months.
Payment Terms: 2%/10, Net 30
FOB: Destination
Time of Delivery: 48 hrs.
Freight: Prepaid and Allowed
Prices firm thru: 09-30-00
Standard commercial warranty - free from defects in materials and workmanship.
All orders are limited to $10,000.00 each. The City of Seattle will not authorize payment for any order exceeding that amount without prior approval by the Buyer, Drelda Mayes on 684-0222.
This contract may be further expanded to include any similar items normally stocked by the supplier provided that the supplier agrees to use the same pricing structure as those specifically listed.
Page 1 of 2

