Mohamed elshahat elmadawey
Port said st_biala_kafr elshikh _Egypt.
Cell: +201062710838/+201007573506
E-mail:
Career Objective:
To obtain a position as a member of your company in which I can exercise my experience as a Instrumentationand control Engineer.
Education
B. SC. Degree in communication and electronics in June 2003.Project: bring in a distributed information system using computer networks.
Project grade :excellent(rank 1st) .
University: Elmansoura University, Egypt.
Faculty: Engineering.
Summary
Seven years’ experience in instruments and control engineering for Oil and Gas company, including field instruments and control systems.
• Preparation of I&C engineering deliverables.
• Detailed Engineering for I&C discipline.
• Technical evaluation of vendors’ offers.
• Sub-contractors engineering review/approval.
• Calibration and installation supervision of field instrument.
• Preparation of Datasheet and Specification for various instruments like Control Valves, Safety V Valves, Smart Transmitters (Pressure , Level ,flow and Temperature), Gas detection Systems, O Orifice plates, Flow Nozzles, Pressure Switches, Level Switches & others.
• Supervise & carryout Loop check and Commissioning of field instruments like Foundation F Field bus and Hart Transmitters, Control & Shutdown valves, vibration & speed sensors, T T Thermocouples, RTD’s and Switches as a part of PMC activities.
•Responsible for inspection and overhauling activities for all machinery.
•Preventive & Corrective Maintenance for Pneumatic Control Loops.
• Maintenance of Shutdown System of Hydrocarbon Vessels.
• Make Calibration For Control Valves & Regulators (Fisher Models and others).
• Make PM, For ESD (Emergency Shutdown Valve).
• Make Calibration For SRV (Safety Relief Valve) ((Pilot & Spring Types)).
• HSE & planning skills:
- Implement the Work Procedure & Risk Assessment.
- Good Ability to Secure Work.
- Able to Organize Instruments Works.
-Able to Estimate Spare Parts for any Instruments.
• Developed a Software tool (Excel) for Instruments Materials check
WORK EXPERIENCE
ALEXANDRIA FOR PETROLEUM MAINTENANCE
The following are the experience gained, and responsibility during my work at NILE DELTA FIELD (ABU MADI) BELAYIM PETROLEUM COMPANY (PETROBEL) through ALEXANDRIA FOR PETROLEUM MAINTENANCEas Instrument,Control andAutomation Engineerfor Maintenance sectorthrough03/2005up till now.
Operation and Maintenance Experience:
1. Controland Measurement Systems
A)Control System
- PLC SIEMENS S-5 Control System.
- Allen Bradley P.L.C 5/15 Software Series 6200
- PLC AUGAST Shutdown Control System.
- DCS ABB&FOXBORO Control System.
- DCS SIEMENS CONTROL SYSTEM.
- Telemecanique Control System (TSX7) For NUVO PIGNONE Compressor
- Single Loop Controllers(ABB MOD. 30&P 4000)
B) Process
I Was Participating In the Following Plants
- Off/On Shore Facilities
- LTS Plants
- LPG Plants
- Storage And Loading Plants For Natural And Liquid Gas
- Transfer Gas Plants By Using Turbo Compressor
- Metering Plants
C) Maintenance Of The Field Instruments
- All Switches & Gauges for (Pres., Temp. Level And Flow)
- All Transmitter For (Pres., Temp., Level And Flow)
- All Control Valves (Nuovo Pignone , Fisher ...), I/P Converter, Positioner
- Shutoff Valve, Blow Down Valve With Local Control Panel (Pneumatic &Hydraulic System)
- Fire Fighting System ( Gas/ Fire Detection)
- Bentley Nevada Speed& Vibration System.
- Gas Detection System (sieger & detronics).
2. GAS COMPRESSORS (NUOVO PIGNONE, SOLAR, SUNDSTRAND & PETER BROTHERHOOD)
- Perform the required preventive and corrective maintenance for all compressors centrifugal & reciprocating (single & multi-stages).
- Execute the required overhauling and inspection for all centrifugal and reciprocating gas
Compressors according to the manufacturer instructions and specifications.
- Trouble shooting; identify the particular problems, its cause and the procedure to solve
It to put the units in a good & safe operating condition.
- Plans the routine and preventive maintenance schedule and the spare parts availability To execute it with a minimum cost.
3.GAS TUEBINES (NUOVO PIGNONE, SOLAR)
- Perform the required preventive and corrective maintenance for the turbo-
Compressors & turbo-generators.
- Perform the required overhauling and inspection according to the manufacturer instructions and specifications.
- Plans the routine and preventive maintenance schedule for all gas turbines and the spare parts availability to execute it with a minimum cost.
- Trouble shooting; identify the particular problems, its cause and the procedure to solve it to put the units in a good & safe operating condition.
- Supervise the operation and the performance of all gas turbines.
4. Heaters and Glycol regeneration.
- Perform the required preventive and corrective maintenance for all heaters.
- Execute the required overhauling and inspection for all heaters according to the manufacturer instructions and specifications.
- Trouble shooting; identify the particular problems, its cause and the procedure to solve
It to put the units in a good & safe operating condition
5.TURBO-EXPANDERS (ROTOFLOW, ATLAS COPCO)
- Perform the required preventive and corrective maintenance for ROTOFLOW turbo-expanders and its relevant systems (seal gas and lube oil).
- Trouble shooting and brake downs problems and put the recommended procedures and modifications necessary to solve the problems.
- Execute the required overhauling and plans the preventive & routine maintenance for all turbo-expanders.
» General Experience Information
- Process Control and Measurement Principles.
- Installation and Maintenance of Pneumatic/Electronic Instrument and Electrical Control and/Or Monitoring Systems Including DCS, PLC and Systems.
- Installation and Maintenance Shutdown Valves and Blow down Valves.
Miscellaneous
- Spare parts fabrication.
- Experience in off shore activities.
- Experience in spare parts ware house operation, and documentation.
- Use the technical manual, and spar parts coding.
- Experience in System Application and Data Processing(SAP)
Languages
- Arabic Language: Excellent “Mother Tongue Language”.
- English Language: Read, write and speak fluently
Computer Skills
- Operating Systems Dos, Windows 95, 98, NT, 2000, XP,
- Strong IT skills including Microsoft Word, Excel and Access.
- Computer maintenance (Hardware, Software),
- Excellent knowledge of the internet
Personal Skills
- Ability to work in groups, and to work under stress.
- Leadership personality; ability to lead, control and supervise different work groups.
- Ability to lead and supervise technicians, and get the best of their efforts.
- Ability to make use of available humans and material resources and optimize their performance.
- Ability to work and live in desert, severe weather conditions and environments.
- Effective communicator at all levels.
- Excellent interpersonal and relationship building skills.
- Pragmatic and flexible approach to change.
- Strong planning and organizational skills.
- Able to work to tight deadlines, working effectively under pressure.
- Team player, but can work equally well using own initiative.
Personal Information
- Marital status : Married.
- Military services: Exempted.
- Nationality : Egyptian.
- Date of birth :Mars 22,1980.
Previous experience
Network engineerat ISPfrom 4/2004 to 2/2005
Page 1 of 4