Construction
Asbestos and Demolition Activities
CAMP
Con_Equipment_BACT
Con Permit Requirements
Con Phase Idling Limitations
Con Phase Mitigation Measures
Developmental Burning
Dust Control Long
Dust Control Short
Hydrocarbon Contaminated Soil
Lead Demolition
Naturally_Occuring_Asbestos
South County Particulate Matter
Support for alternative transportation project component
Trucking Routing
..Operational
Ag Burning
Diesel PM
Equestrian_Facility
Gas_Stations
Health_Risk_Assessment_TypeA
Health_Risk_Assessment_TypeB
Mixed Use Incompatibility
New_School_Site
Nuisance
Op_Permit_Requirements
Op_Phase_Impacts_Below
Op_Phase_Impacts_Exceeds
Op Phase Truck Idling
Residential Wood Combustion
SLO Car Free Program
Unpaved Roads Driveways Parking Areas
UST Removal Degassing
Demolition Activities
Demolition / Asbestos
Demolition activities can have potential negative air quality impacts, including issues surrounding proper handling, abatement, and disposal of asbestos containing material (ACM). Asbestos containing materials could be encountered during the demolition or remodeling of existing buildings or the disturbance, demolition, or relocation of above or below ground utility pipes/pipelines (e.g., transite pipes or insulation on pipes). If this project will include any of these activities, then it may be subject to various regulatory jurisdictions, including the requirements stipulated in the National Emission Standard for Hazardous Air Pollutants (40CFR61, Subpart M - asbestos NESHAP). These requirements include, but are not limited to: 1) written notification, within at least 10 business days of activities commencing, to the APCD, 2) asbestos survey conducted by a Certified Asbestos Consultant, and, 3) applicable removal and disposal requirements of identified ACM. Please contact the APCD Engineering & Compliance Division at (805) 781-5912 for further information.
Construction Activity Management Plan
If the estimated construction emissions from the actual fleet are expected to exceed either of the APCD Quarterly Tier 2 thresholds of significance (ROG+NOx and/or PM) after the standard and BACT measures are factored into the estimation, then an APCD approved CAMP (See the APCD’s 2012 CEQA Handbooks Technical Appendix 4.5 for CAMP Guidelines) and off-site mitigation need to be implemented in order to reduce potential air quality impacts to a level of significance. The CAMP should be submitted to the APCD for review and approval prior to the start of construction and should include, but not be limited to, the following elements:
§ A Dust Control Management Plan that encompasses all, but is not limited to, dust control measures that were listed above in the “dust control measures” section;
§ Tabulation of on and off-road construction equipment (age, horse-power and miles and/or hours of operation);
§ Schedule construction truck trips during non-peak hours to reduce peak hour emissions;
§ Limit the length of the construction work-day period, if necessary; and,
§ Phase construction activities, if appropriate.
Best Available Control Technology (BACT) for Construction Equipment
If the estimated construction phase ozone precursor emissions from the actual fleet for a given Phase are expected to exceed the APCD’s threshold of significances after the standard mitigation measures are factored into the estimation, then BACT needs to be implemented to further reduce these impacts. The BACT measures can include:
1. Further reducing emissions by expanding use of Tier 3 and Tier 4 off-road and 2010 on-road compliant engines;
2. Repowering equipment with the cleanest engines available; and
Installing California Verified Diesel Emission Control Strategies. These strategies are listed at: http://www.arb.ca.gov/diesel/verdev/vt/cvt.htm
Construction Permit Requirements
Based on the information provided, we are unsure of the types of equipment that may be present during the project’s construction phase. Portable equipment, 50 horsepower (hp) or greater, used during construction activities may require California statewide portable equipment registration (issued by the California Air Resources Board) or an APCD permit.
The following list is provided as a guide to equipment and operations that may have permitting requirements, but should not be viewed as exclusive. For a more detailed listing, refer to the Technical Appendices, page 4-4, in the APCD's 2012 CEQA Handbook.
· Power screens, conveyors, diesel engines, and/or crushers;
· Portable generators and equipment with engines that are 50 hp or greater;
· Electrical generation plants or the use of standby generator;
· Internal combustion engines;
· Rock and pavement crushing;
· Unconfined abrasive blasting operations;
· Tub grinders;
· Trommel screens; and,
· Portable plants (e.g. aggregate plant, asphalt batch plant, concrete batch plant, etc).
To minimize potential delays, prior to the start of the project, please contact the APCD Engineering & Compliance Division at (805) 781-5912 for specific information regarding permitting requirements.
Construction Phase Idling Limitations
This project is in close proximity to nearby sensitive receptors (XXXXXXXXXXXXXXXXXXXXX). Projects that will have diesel powered construction activity in close proximity to any sensitive receptor shall implement the following mitigation measures to ensure that public health benefits are realized by reducing toxic risk from diesel emissions:
To help reduce sensitive receptor emissions impact of diesel vehicles and equipment used to construct the project, the applicant shall implement the following idling control techniques:
1. California Diesel Idling Regulations
a. On-road diesel vehicles shall comply with Section 2485 of Title 13 of the California Code of Regulations. This regulation limits idling from diesel-fueled commercial motor vehicles with gross vehicular weight ratings of more than 10,000 pounds and licensed for operation on highways. It applies to California and non-California based vehicles. In general, the regulation specifies that drivers of said vehicles:
1. Shall not idle the vehicle’s primary diesel engine for greater than 5 minutes at any location, except as noted in Subsection (d) of the regulation; and,
2. Shall not operate a diesel-fueled auxiliary power system (APS) to power a heater, air conditioner, or any ancillary equipment on that vehicle during sleeping or resting in a sleeper berth for greater than 5.0 minutes at any location when within 1,000 feet of a restricted area, except as noted in Subsection (d) of the regulation.
b. Off-road diesel equipment shall comply with the 5-minute idling restriction identified in Section 2449(d)(2) of the California Air Resources Board’s In-Use Off-Road Diesel regulation.
c. Signs must be posted in the designated queuing areas and job sites to remind drivers and operators of the state’s 5-minute idling limit.
d. The specific requirements and exceptions in the regulations can be reviewed at the following web sites: www.arb.ca.gov/msprog/truck-idling/2485.pdf and www.arb.ca.gov/regact/2007/ordiesl07/frooal.pdf.
AND/OR
2. Diesel Idling Restrictions Near Sensitive Receptors (List sensitive receptors here based on the following list: schools, residential dwellings, parks, day care centers, nursing homes, and hospitals – if none, then eliminate “b”)
In addition to the state required diesel idling requirements, the project applicant shall comply with these more restrictive requirements to minimize impacts to nearby sensitive receptors:
a. Staging and queuing areas shall not be located within 1,000 feet of sensitive receptors;
b. Diesel idling within 1,000 feet of sensitive receptors shall not be permitted;
c. Use of alternative fueled equipment is recommended; and
d. Signs that specify the no idling areas must be posted and enforced at the site.
Standard Mitigation Measures for Construction Equipment
The standard construction equipment mitigation measures for reducing nitrogen oxide (NOx), reactive organic gases (ROG), and diesel particulate matter (DPM) emissions are listed below and in section 2.3.1 of the APCD’s 2012 CEQA Handbook. These measures are applicable to all projects where construction phase emissions exceed APCD thresholds:
· Maintain all construction equipment in proper tune according to manufacturer’s specifications;
· Fuel all off-road and portable diesel powered equipment with ARB certified motor vehicle diesel fuel (non-taxed version suitable for use off-road);
· Use diesel construction equipment meeting ARB's Tier 2 certified engines or cleaner off-road heavy-duty diesel engines, and comply with the State off-Road Regulation;
· Use on-road heavy-duty trucks that meet the ARB’s 2007 or cleaner certification standard for on-road heavy-duty diesel engines, and comply with the State On-Road Regulation;
· Construction or trucking companies with fleets that that do not have engines in their fleet that meet the engine standards identified in the above two measures (e.g. captive or NOx exempt area fleets) may be eligible by proving alternative compliance;
· All on and off-road diesel equipment shall not idle for more than 5 minutes. Signs shall be posted in the designated queuing areas and or job sites to remind drivers and operators of the 5 minute idling limit;
· Diesel idling within 1,000 feet of sensitive receptors is not permitted;
· Staging and queuing areas shall not be located within 1,000 feet of sensitive receptors;
· Electrify equipment when feasible;
· Substitute gasoline-powered in place of diesel-powered equipment, where feasible; and,
· Use alternatively fueled construction equipment on-site where feasible, such as compressed natural gas (CNG), liquefied natural gas (LNG), propane or biodiesel.
Developmental Burning
Effective February 25, 2000, the APCD prohibited developmental burning of vegetative material within San Luis Obispo County. If you have any questions regarding these requirements, contact the APCD Engineering & Compliance Division at (805) 781-5912.
Dust Control Measures
Construction activities can generate fugitive dust, which could be a nuisance to local residents and businesses in close proximity to the proposed construction site. Projects with grading areas that are greater than 4-acres or are within 1,000 feet of any sensitive receptor shall implement the following mitigation measures to manage fugitive dust emissions such that they do not exceed the APCD’s 20% opacity limit (APCD Rule 401) or prompt nuisance violations (APCD Rule 402):
a. Reduce the amount of the disturbed area where possible;
b. Use of water trucks or sprinkler systems in sufficient quantities to prevent airborne dust from leaving the site and from exceeding the APCD’s limit of 20% opacity for greater than 3 minutes in any 60 minute period. Increased watering frequency would be required whenever wind speeds exceed 15 mph. Reclaimed (non-potable) water should be used whenever possible;
c. All dirt stock pile areas should be sprayed daily and covered with tarps or other dust barriers as needed;
d. Permanent dust control measures identified in the approved project revegetation and landscape plans should be implemented as soon as possible, following completion of any soil disturbing activities;
e. Exposed ground areas that are planned to be reworked at dates greater than one month after initial grading should be sown with a fast germinating, non-invasive, grass seed and watered until vegetation is established;
f. All disturbed soil areas not subject to revegetation should be stabilized using approved chemical soil binders, jute netting, or other methods approved in advance by the APCD;
g. All roadways, driveways, sidewalks, etc. to be paved should be completed as soon as possible. In addition, building pads should be laid as soon as possible after grading unless seeding or soil binders are used;
h. Vehicle speed for all construction vehicles shall not exceed 15 mph on any unpaved surface at the construction site;
i. All trucks hauling dirt, sand, soil, or other loose materials are to be covered or should maintain at least two feet of freeboard (minimum vertical distance between top of load and top of trailer) in accordance with CVC Section 23114;
j. Install wheel washers where vehicles enter and exit unpaved roads onto streets, or wash off trucks and equipment leaving the site;
k. Sweep streets at the end of each day if visible soil material is carried onto adjacent paved roads. Water sweepers shall be used with reclaimed water should be used where feasible. Roads shall be pre-wetted prior to sweeping when feasible;
l. All PM10 mitigation measures required should be shown on grading and building plans; and,
m. The contractor or builder shall designate a person or persons to monitor the fugitive dust emissions and enhance the implementation of the measures as necessary to minimize dust complaints, reduce visible emissions below the APCD’s limit of 20% opacity for greater than 3 minutes in any 60 minute period. Their duties shall include holidays and weekend periods when work may not be in progress. The name and telephone number of such persons shall be provided to the APCD Engineering & Compliance Division prior to the start of any grading, earthwork or demolition.
Dust Control Measures
The project, as described in the referral, will not likely exceed the APCD’s CEQA significance threshold for construction phase emissions. However, construction activities can generate fugitive dust, which could be a nuisance to local residents and businesses in close proximity to the proposed construction site. APCD staff recommends the following measures be incorporated into the project to control dust:
Projects with grading areas that are less than 4-acres and that are not within 1,000 feet of any sensitive receptor shall implement the following mitigation measures to significantly reduce fugitive dust emissions, to manage fugitive dust emissions such that they do not exceed the APCD 20% opacity limit (APCD Rule 401) and minimize nuisance impacts:
a. Reduce the amount of the disturbed area where possible;
b. Use water trucks, APCD approved dust suppressants (see Section 4.3 in the CEQA Air Quality Handbook), or sprinkler systems in sufficient quantities to prevent airborne dust from leaving the site and from exceeding the District’s limit of 20% opacity for greater than 3 minutes in any 60 minute period. Increased watering frequency would be required whenever wind speeds exceed 15 mph. Reclaimed (non-potable) water should be used whenever possible;
c. All dirt stock-pile areas should be sprayed daily and covered with tarps or other dust barriers as needed;
d. All roadways, driveways, sidewalks, etc. to be paved should be completed as soon as possible, and building pads should be laid as soon as possible after grading unless seeding, soil binders or other dust controls are used;
e. All of these fugitive dust mitigation measures shall be shown on grading and building plans; and,
f. The contractor or builder shall designate a person or persons to monitor the fugitive dust emissions and enhance the implementation of the measures as necessary to minimize dust complaints, reduce visible emissions below 20% opacity. Their duties shall include holidays and weekend periods when work may not be in progress.
Hydrocarbon Contaminated Soil
Should hydrocarbon contaminated soil be encountered during construction activities, the APCD must be notified as soon as possible and no later than 48 hours after affected material is discovered to determine if an APCD Permit will be required. In addition, the following measures shall be implemented immediately after contaminated soil is discovered: