16.1SPRINKLER INSTALLATION
ITEM / PARTICULARS REQUIRED / DETAILSSPECIFIED / OFFERED
1. / SPRINKLER HEADS
Make
-Country of Origin
-Date of Manufacture
-Material
-Approved by
-Ordinary hazard / -
-
-
-
ASIB
15mm/68C
2. / SPRINKLER MAIN STOP VALVE
Make
-Type
-Approved by / -
-
ASIB
3. / SPRINKLER PIPEWORK AND FITTINGS
Make
Material
-Finish / -
Mild steel
Non Galvanised
4. / PIPEWORK SUPPORTS
Make
Material
-Fixing Detail / -
Galvanised
Clamped
1.SCHEDULE OF ADDITIONAL RATES
The following schedule of rates must be completed in full to cater for any additions/omissions or variations to the contract as specified.
All schedules must:
- Be suitable for the supply and installation of new equipment as specified.
- Be valid for the period of the contract
- Include all profit, taxes, etc
- Include rates to cover sprinkler and fire protection equipment
ITEM / SUPPLY AND DELIVER
(Rands) / INSTALLATION
(Rands) / TOTAL
(Rands)
1.PIPEWORK
1.1Lengths
25mmm
32mmm
40mmm
50mmm
65mmm
80mmm
100mm m
125mm m
150mm m
200mm m
1.2Fittings
25mmT
32mmT
40mmT
50mmT
65mmT
80mmT
100mm T
125mm T
150mm T
200mm T
25mm90
32mm90
40mm90
50mm90
65mm90
80mm90
100mm 90
125mm 90
150mm 90
200mm 90
25mmReducer
32mmReducer
40mmReducer
50mmReducer
65mmReducer
80mmReducer
100mm Reducer
125mm Reducer
150mm Reducer
200mm Reducer
1.3Valves
25mm
32mm
40mm
50mm
65mm
80mm
100mm
125mm
150mm200mm
1.4Painting of Pipework
25mm
32mm
40mm
50mm
65mm
80mm
100mm
125mm
150mm
200mm
250mm
1.5Equipment (Excluding Pipework)
1.5.1Sprinkler Heads (each)
15mm68C
15mm141C
1.6Sprinkler Control Valves stations complete including gong, gauges, test drains, etc.
1.6.1 80 mm
1.6.2 100 mm
2.CONTRACT PRICE SCHEDULE
The following schedule of prices including escalation for a fixed price must be completed for the supply, installation, commissioning and handover of the complete installations as specified.
No / Item / Unit / Quantity / Rate / Total Cost1 / FIRE SPRINKLER SYSTEM
1.1 / Isolating, draining and refilling of ground fire sprinkler systems / nr / 5
1.2 / Removal of existing sprinkler heads and capping of existing roof level fire sprinkler systems for duration of construction period. / nr / 128
1.3 / Modifications and relocation of existing roof level fire sprinkler systems to suit new layouts and lift shaft, incl. main pipes, branches, range pipes, spares, painting, pressure and flow tests, etc. to provide fully working systems / sum
1.4 / Removal of capping and supply and installation of new ordinary hazard sprinkler heads for roof level sprinkler systems, incl. spares, painting, pressure and flow tests, etc. to provide fully working systems / nr / 128
1.5 / Supply and installation of new pendant-type ordinary hazard sprinkler system on 2nd floor under new mezzanine floor, incl. main pipes, branches, range pipes, spares, painting, pressure and flow tests, etc. to provide fully working systems.
Pro-rata allowance to be made per sprinkler head for branch piping.
Allow for 60m of dia100mm sprinkler mains. / nr / 92
1.6 / Supply and installation of additional fittings to accommodate extension of sprinkler system down to future ceiling level on 2nd floor under new mezzanine floor / sum
1.7 / Cut-back and isolation of existing sprinkler system underneath 2nd floor soffit to accommodate new lift shaft pit, incl. rigging and scaffolding / prov / sum / R25 000.00
2 / FIRE FIGHTING EQUIPMENT
2.1 / Supply and installation of new fire hydrant on Mezzanine level connected to existing fire supply mains (not sprinkler mains) incl. all valves, piping, fittings, painting, etc to provide fully working systems
Allow for 30m of dia100mm hydrant mains piping per hydrant. / nr / 1
2.2 / Supply and installation of new 30m fire hose reel on Mezzanine levelconnected to existing fire supply mains (not sprinkler mains) incl. all valves, piping, fittings, painting, etc to provide fully working systems
Allow for 20m of dia35mm hose reel piping per hose reel. / nr / 2
2.3 / Supply and installation of portable fire extinguishers type DCP 4.5kg,incl brackets, painted timbr back boards and mounting / Nr / 6
3. / ELECTRICAL WORKS
3.1 / Any and all electrical works which may be required to deliver fully functional installation / sum
4. / SCAFFOLDING, RIGGING AND BUILDERS WORK
4.1 / Supply and installation of all required scaffolding / sum
4.2 / Supply and installation of all required rigging / sum
4.3 / Supply and installation of all required builders work, incl. core drilling / sum
5. / GENERAL
5.1 / Preliminary and general / sum
5.2 / Commissioning cost / sum
5.3 / Complete as built drawings including complete electrical drawings as well as operation and 3-off maintenance manuals / sum
5.4 / Twelve month guarantee and maintenance period / sum
5.5 / Unforeseen alterations to existing sprinkler installations / prov / sum / R 35 000.00
6. / TOTAL CONTRACT PRICE
excl. VAT
(CARRIED FORWARD)