Note to reviewers:
This draft specification was formerly 40-10. It is renumbered for review purposes as XX-Z. It is currently anticipated that it will not be placed in section 40, but in some other section yet to be determined.
Associated 2010 updates with this specification:
1.RSS: Add to section 41-9.01A, "Bond breaker must comply with section XX-Z."
2.RSS: Delete section 41-9.02C
3.RSS: Delete section 41-9.03E
4.RSS: Delete item 4 in the list in the 1st paragraph of section 28-2.03F
5.Update SSP 40-3: In the third paragraph, delete “and bond breaker” and insert “and” before “drill”
Revised to be used on new construction (or lane replacement) only. Bond breaker for individual slab replacement will be included in the replacement item.
Page 1 of 2
Section XX-Z. Use for bond breaker for concrete pavement.
Replace section XX-Z with:
XX-Z BOND BREAKER
XX-Z.01 GENERAL
XX-Z.01A Summary
Section XX-Z includes specifications for furnishing, placing, and protecting bond breaker.
XX-Z.01B Definitions
bond breaker: Material placed between the base material and concrete pavement to prevent or limit bonding of the pavement with the base.
XX-Z.01C Submittals
Submit a certificate of compliance for each lot of bond breaker material delivered.
XX-Z.02 MATERIALS
XX-Z.02A General
Not Used
XX-Z.02B Bond Breaker on Existing Base
Bond breaker must comply with the specifications shown in the following table:
Bond BreakerBond breaker no. / Type / Specification
1 / PG asphalt binder, Grade PG 64-10 / Comply with section 92
2 / Curing compound no. 3 / Comply with section 90-1.03B(3)(b) and 90-1.03B(3)(c)
3 / White opaque polyethylene film / Comply with ASTM C 171 except the minimum thickness must be 6 mils
4 / White curing paper / Comply with ASTM C 171
Bond breaker must be one of the following:
1.White curing paper complying with ASTM C 171
2.White opaque polyethylene film complying with ASTM C 171 except the minimum thickness must be 6 mils
3.Paving asphalt, Grade PG 64-10, complying with section 92
4.Curing compound no. 3 complying with section 90
XX-Z.02C Bond Breaker on New Base
Bond breaker must be curing compound no.3 complying with section 90.
XX-Z.03 CONSTRUCTION
XX-Z.03A General
Before placing bond breaker, remove foreign and loose materials from the base.
Place bond breaker less than 72 hours before covering it with pavement.
Use bond breaker no. 1 or 2 on LCB. Use bond breaker no. 3 or 4 on LCBRS and CTPB.
Except when pavement is placed against previously placed pavement, extend the bond breaker at least 6 inches beyond the limits of the planned concrete placement.
XX-Z.03B Placement
Curing paper or polyethylene filmmust not be wrinkled. Overlap adjacent sheets a minimum of 6 inches and in the same direction as the concrete pour. Tape or bond the sheets together.Secure the bond breaker sufficiently so that it remains in place during concrete pavement placement. Ensure that no concrete gets under the bond breaker.
Before placing paving asphalt, do not add water. Apply the paving asphaltbond breaker no. 1 in 1 even application at a rate from 0.02 to 0.10 gallons per square yardover the entire base surface area. Do not add water to bond breaker. Do not place concrete pavement until the paving asphaltbond breaker has cured.
Apply curing compound, in 2 separate applications. Apply each application evenly at a rate from 0.07 to 0.11 gallons per square yard over the entire base surface area. If curing compound has previously been applied, you may apply only a single coatbond breakerno. 2 at a rate of 0.045 gallons per square yard or more..
Curing paper or polyethylene filmBond breakers no. 3 and 4must not be wrinkled. Overlap adjacent sheets a minimum of 6 inches and in the same direction as the concrete pour. Tape or bond the sheets together as needed to prevent sheets from folding or wrinkling.. Secure the bond breaker sufficiently so that it remains in place during concrete pavement placement. Ensure that no concrete gets under the bond breaker.
XX-Z.03C Protecting Bond Breaker
Protect bond breaker from damage. Repair damaged bond breaker.
XX-Z.04 PAYMENT
If dimensions are shown for bond Bond breaker, measurement is measured based onthose dimensions.the dimensions shown.
If dimensions are not shown, bond breaker is measured as the actual length of the pavement placed times the specified width of pavement placed on the bond breaker. No payment is made for overlaps.