FORM OF JOB ORDER

Date:
Job Order Project Number:
Job Order Project Name:
JOC “Contractor”:
Arizona State University (“Owner”)
This Job Order is issued pursuant to the Agreement Between Owner and Contractor for Job Order Contracts, dated August 1, 2015, and the other JOC Contract Documents. This Job Order is the Notice to Proceed with the above Job Order Project on the below Job Order Beginning Date. The terms of this Job Order are as follows:
Part I - Scope of Job Order Work
Full street or physical address of each location at which Job Order Work will be done under this Job Order:
1.Description of the Scope of Job Order Work :
2.Job Order costs may be determined by one of three (3) methods or by combinationof methods. The determination as to which method will be used is at the discretion of the Owner in concert with the Contractor at the time a prospective Job Order project is identified to the Contractor.
  1. Unit Price Method: Pricing using a Unit Price Book (UPB). The University will provide an Excel spreadsheet, Exhibit E, to the Contractor to prepare the total cost estimate. This method utilizes the following Cost Data books RSMeans CostWorks, as published annually with quarterly updates by Construction Market Data, with local location factors applied to an electronic version of the RSMeans CostWorks Software for the Year of the contract.
Means Facility Construction Cost Data (Computer CD Version)***
  1. Facilities Construction Cost Data Book
  2. Facilities & Commercial Renovation Cost Data Book
  3. Facilities Maintenance and Repair Cost Data Book
*** Computer CD Version Normalized to Phoenix Zip Code 850,
Updated quarterly with inflation data
  1. Three Bid Method: Pricing consists of obtaining a maximum of three quotes, unless otherwise approved by Owner, from a list of pre-qualified subcontractors for each trade, selecting the lowest quote.
  1. For each CSI division on the JOC Cost Proposal and Schedule of Values, the following scale shall be used when receiving subcontractor bids for work:
$0 - $18,0001 Subcontractor Bid Required
$18,001 - $50,0002 Subcontractor Bid Required
  1. Self-Perform Work: Proposer may self-perform any or all work. The proposed self-performed work is subject to the requirements listed below.
  1. The self-performed work then requires the proposers Bid plus a minimum of two additional Bids form pre-qualified contractors approved by Owner prior to bid solicitation.
  2. Any self-performed work must be submitted, reviewed and approved by Owner’s Representative prior to the bidding process.
  1. Quote evaluation and selection
  1. All bids will be opened by the JOC Contractor.
  2. Self-performed work shall comply with procedures established in Section 2.6.13 of the General Conditions and delivered to ASU Purchasing sealed. Selection of the successful subcontractors bid will be decided by the Owner’s Representative in accordance with Section 2.6.9.4.3 of the Contractor General Conditions.
C.Unit Pricing / Three Bid Method: Pricing using a combination of the two methods above or other unit pricing methods as approved by the University.
3.Description, Unit of Measurement, and price of tasks (Other Tasks) and their prices (Other Prices) not included in the Owner Standard Task and Price Data Base or the Means UPB, if any:
Task Description / Unit of Measurement / Unit Cost
a.
b.
c.
d.
4.A list of Drawings and Specifications for the Project is attached as Attachment 2.
JOB ORDER / Job Order Number: / Date:
Part II - Specific Information
1. Job Order Price / $
2. Schedule / Job Order Beginning Date:
(Date construction must start)
3. Substantial Completion / Job Order Substantial Completion Date
(Date of Owner Occupancy)
4. Liquid Damages / Liquidated Damages per Day if Substantial Completion is not achieved by the agreed upon date. Damages are assigned on a project per project basis based on the criticality of the project and agreed upon by JOC Contractor, / $
5. Final Completion Date / Job Order Final Completion Date:
(Date construction is complete (including, without limitation, all deficiency, incomplete or correction items (Job Order Punch List)
If there are more than sixty (60) days between the Beginning Date and the Final Completion Date or if Owner has requested a Job Order Progress Schedule, a Job Order Progress Schedule is attached as Attachment 3, or, if not attached, Contractor is to submit a Job Order Progress Schedule on or before the date to the right and when approved by Owner, this Job Order Progress Schedule will be attached as Attachment 3.
Part III - Points of Contact
Owner Representative / Address / Phone Number
Name & Title / Fax Number
Owner Principal Representative / Address / Phone Number
Name & Title / Fax Number
Contractor Principal Representative / Address / Phone Number
Name & Title / Fax Number
Site Manager / Address / Phone Number
Name & Title / Fax Number
Design Professional / Company Name
Name / Address / Phone Number
Title / Fax Number
Part IV - Other Requirements
A Notice Concerning Environmental Matters and Hazardous Substances in the Job Order Work Area is attached
asAttachment 4.
The following checked items are required. The requirements for each are in the Operating Manual
Submittals
Shop Drawings
Samples
Product Data
Part V – Approvals
Owner Representative / Signature / Date
Owner Signature / Signature / Date
JOC Contractor Representative / Signature / Date
Advantage / Area/Org / Signature / Date

Page 1 of 4PUR REV B 082515