Last Updated 6/14/02
CONTRACT SUMMARY
This information will made available to the public on the State Water Resources Control Board’s (SWRCB) Website (see address below).
Date filled out:7/25/04
A) Contract Information Please use complete phrases/sentences. Fields will expand as necessary as you type.1. Contract Number: 02-077-555-0
2. Project Title: Restoring Deer Creek: Building Partnerships to Overcome the Legacy of the Gold Rush Era
3. Project Purpose – Problem: To turn a heavily degraded stream that flows through the center of a small town into a resource
for aquatic organisms, for education and for the direct benefit for the citizens.
4. Project Goals:
a. Short-term Goals: 1. To finish restoration site in Pioneer Park started under Prop 204 funding.
2. To develop a restoration plan for the watershed.
3. To assist local government to draft protocols and ordinances to reduce sediment contamination.
4. To produce outreach materials to explain the public role in reducing non-point source pollution.
b. Long-term Goals: 1. To continue base line water quality monitoring
2. To assist waste treatment plants in reducing the effects of tertiary treated waters on the ecology
of the watershed.
3.To identify, prioritize and start new restoration projects.
4.To develop strategies to reduce sediment load in the watershed (e.g. Storm drains)
5. Project Location: (lat/longs, watershed, etc) Deer Creek watershed / 39º15N 121°01W
a. Physical Size of Project: (miles, acres, sq. ft., etc.)
32 miles in length and aprox. 57,000 acres / b. Counties included in the project: Nevada
c. Legislative Districts: (Assembly and Senate) / Assembly – 03 / Senate - 01
6. Which SWRCB program is funding this contract? Please put an "X" by the one that applies.
__X Prop 13 ___ EPA 319(h) ___ Other
B) Contract Contact: Refers to contract project director.
Name: Joanne Hild / Job Title: Executive Director
Organization: Friends of Deer Creek / Webpage Address: www.friendsofdeercreek.org
Address: 132 Main Street, Nevada City, CA 95959
Phone: 530-265-6090 / Fax number: NA
Email:
C. Contract Time Frame: Refers to the implementation period of the contract.
From: November 1, 2003 / To: March 31, 2006
D) Project Partner Information: Name all agencies/groups involved with project. City of Nevada City, Nevada Irrigation District, County of Nevada, Natural Heritage Institute, Yuba Watershed Council, Nevada County Land Trust, Bureau of Land Management
E) Nutrient and Sediment Load Reduction Projection (if applicable):
/ NAPLEASE PROVIDE A HARD COPY AND AN ELECTRONIC COPY TO YOUR CONTRACT MANAGER AND YOUR PROGRAM ANALYST WITH YOUR QUARTERLY/MONTHLY REPORT. ALL APPLICABLE FIELDS ARE MANDATORY. IF FIELD IS NOT APPLICABLE, PLEASE PUT N/A IN BLOCK. INCOMPLETE FORMS WILL BE RETURNED. THE ELECTRONIC VERSION OF THIS FORM CAN BE FOUND AT: http://www.swrcb.ca.gov/nps/319hproj.html.