SECTION 04850 (04 40 00)
MSI PRECAST STONE VENEER SYSTEM
PART 1 GENERAL
1.1 SECTION INCLUDES
A. MSI Precast Stone Veneer for exterior and interior vertical surfaces.
1.2 RELATED SECTIONS
Specifier Notes: Edit the following list of related sections as required for the project. List other sections with work directly related to this section. Delete sections not required.
A. Section 04810 (04 22 00) – Unit Masonry Assemblies (Concrete Unit Masonry): Masonry supporting walls.
B. Section 05400 (05 40 00) – Cold-Formed Metal Framing: Formed steel-framed supporting walls.
C. Section 05500 (05 50 00) – Metal Fabrications: Galvanized shelf angles, structural supports, anchors and other built-in components for building into natural thin veneer stone.
D. Section 06110 (06 11 00) – Wood Framing: Wood frame supporting walls.
E. Section 06160 (06 16 00) – Sheathing: Wood frame supporting walls.
F. Section 07900 (07 90 00) – Joint Sealers (Joint Protection): Sealant and joint filler for perimeter and control joints.
G. Section 09220 (09 24 00) – Portland Cement Plaster (Portland Cement Plastering): Metal lath and scratch coat back-up over supporting walls.
1.3 REFERENCES
Specifier Notes: List standards referenced in this section, complete with designations and titles. Delete standards not included in the edited section. This article does not require compliance with standards, but is merely a listing of those used.
A. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars
B. ASTM C348 - 08 Standard Test Method for Flexural Strength of Hydraulic-Cement Mortars
C. ASTM C482 - 02(2009) Standard Test Method for Bond Strength of Ceramic Tile to Portland Cement Paste
D. ASTM C67 - Standard Test Methods for Sampling and Testing Brick and Structural Clay Tile
E. ASTM C567 / C567M - 11 Standard Test Method for Determining Density of Structural Lightweight Concrete
F. ASTM C39 / C39M - 12 Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
G. PCA – Portland Cement Plaster (Stucco) Manual.
H. Uniform Building Code (UBC) Standard 15.5
J. International Conference of Building Officials (ICBO) AC- 51-2001
1.4 SUBMITTALS
Specifier Notes: Edit submittal requirements as required. Delete submittal types not required.
A. Comply with Section 01330 (01 33 00) – Submittal Procedures.
B. Product Data: Submit manufacturer's product data on stone, rail system, and fasteners, including:
1. Surface preparation and installation instructions.
2. Storage and handling instructions.
C. Shop Drawings: Submit manufacturer’s shop drawings, including plans, elevations, sections, and details, indicating layout, dimensions, anchorages, and jointing methods.
D. Verification Samples: Submit 2 manufacturer’s full-size samples of MSI precast veneer stone for each pattern specified.
E. Warranty: Submit manufacturer’s standard warranty for MSI panelized stone veneer system.
1.5 QUALITY ASSURANCE
A. Manufacturer’s Qualifications: Manufacturer regularly engaged, for preceding 10 years, in manufacture of MSI precast stone veneer stone of similar type to that specified.
Specifier Notes: Include a mock-up if the project size or quality warrant taking such a precaution. Edit mock-ups as required. Delete mock-ups if not required.
B. Mock-Ups: Provide a mock-up for evaluation of surface preparation techniques and application workmanship.
1. Finish areas designated by Architect.
2. Do not proceed with remaining work until workmanship, color, and sheen are approved by Architect.
3. Refinish mock-up area as required to produce acceptable work.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Delivery: Deliver materials to site in manufacturer’s original, unopened containers and packaging, with labels clearly identifying product name and manufacturer.
B. Storage:
1. Store materials in accordance with manufacturer’s instructions.
2. Store materials in manufacturer's unopened packaging until ready for installation.
3. Store stone materials on pallets on dry, level surface and cover with tarps if heavy rain is anticipated.
4. Do not stack pallets.
C. Handling: Protect materials during handling and installation to prevent damage or contamination.
1.7 PROJECT ENVIRONMENTAL REQUIREMENTS
A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results.
B. Do not install MSI Precast Stone Veneer under environmental conditions outside manufacturer's limits.
PART 2 PRODUCTS
2.1 MANUFACTURER
A. M-Rock, Inc., PO Box 458, Peterstown, WV 24963. Toll Free (866) 896-7625. Phone (304) 753-5800. Fax (304) 753-5058. Website www.m-rockstone.com E-mail
2.2 MSI PRECAST STONE VENEER
Specifier Notes: MSI Precast Stone Veneer collections and patterns are listed alphabetically. Specify required collections and patterns. Delete collections and patterns not required.
1. Collection: “Aspen" Ledge Stone.
a. Height: 5 inches (coverage) 6 1/2 inches (total)
b. Length: 20 inches (coverage) 20 3/8 inches (total)
c. Nominal Thickness: 1 3/4 inch to 3 inches (44 mm to 76 mm).
d. Color: Slate gray tones with cream/ecru and firebrick red touch.
e. Material: Portland cement (Light weight expanded slate, pigment, admix, water)
2. Collection: “Horizon” Dry Stack Stone.
a. Height: 5 inches (coverage) 6 1/2 inches (total)
b. Length: 20 inches (coverage) 20 3/8 inches (total)
c. Nominal Thickness: 1 3/4 inch to 3 inches (44 mm to 76 mm).
d. Color: Beige and tan tones with red/light red touch.
e. Material: Portland cement (Light weight expanded slate, pigment, admix, water)
3. Collection: “Indian Creek" Canyon Stone.
a. Height: 5 inches (coverage) 6 1/2 inches (total)
b. Length: 20 inches (coverage) 20 3/8 inches (total)
c. Nominal Thickness: 1 3/4 inch to 3 inches (44 mm to 76 mm).
d. Color: Beige and tan tones with red/light red touch.
e. Material: Portland cement (Light weight expanded slate, pigment, admix, water)
4. Collection: “Meridian” Ledge Stone.
a. Height: 5 inches (coverage) 6 1/2 inches (total)
b. Length: 20 inches (coverage) 20 3/8 inches (total)
c. Nominal Thickness: 1 3/4 inch to 3 inches (44 mm to 76 mm).
d. Color: Beige tones with red/light red and gray or black touch.
e. Material: Portland cement (Light weight expanded slate, pigment, admix, water)
5. Collection: “Reveal” Dry Stack Stone.
a. Height: 5 inches (coverage) 6 1/2 inches (total)
b. Length: 20 inches (coverage) 20 3/8 inches (total)
c. Nominal Thickness: 1 3/4 inch to 3 inches (44 mm to 76 mm).
d. Color: Slate gray tones with cream/ecru and firebrick red touch.
e. Material: Portland cement (Light weight expanded slate, pigment, admix, water)
6. Collection: “The Gray or Blackstone" Canyon Stone.
a. Height: 5 inches (coverage) 6 1/2 inches (total)
b. Length: 20 inches (coverage) 20 3/8 inches (total)
c. Nominal Thickness: 1 3/4 inch to 3 inches (44 mm to 76 mm).
d. Color: Gray tones with light red touch.
e. Material: Portland cement (Light weight expanded slate, pigment, admix, water)
2.3 SPECIAL SHAPES
Specifier Notes: Specify special shapes as required. Delete special shapes not required. Indicate location and sizes of special shapes on the Drawings.
A. Provide special shapes as indicated on the Drawings and as follows:
1. Trimstones.
2. Hearthstones.
3. Keystones.
4. Rockface sills.
5. Corners (inside / outside)
6. ______.
B. Color:
Specifier Notes: Specify color of special shapes as required. Delete colors not required.
1. Cream/ecru.
2. Slategray.
3. Tan.
4. Beige
5. Firebrick red.
6. Gray or black.
2.4 ACCESSORIES
A. M-Trim: 42 inches and available in gray an brown tones.
· Two Piece System
· Adhesive Bond allows for different stones
· Universal design for all projects
· Cuts easily for wrapping corners or windows
· Cuts / Finishes any termination point
B. Starter strip: This is used along the bottom row of the stone to lock the First Row into place.
C. Universal Trim: A 2”x20” trim piece that can be used in many different ways, depending on the project. It can be used to finish the top of a project area, to trim around windows and doors, or to butt the stone to another surface.
D. Column Cap: M-Rock’s Pyramid Post Cap has a 2” overhang to conceal the top of your last row of stone.
E. Column Trim (Post Trim Ring): This trim allows the post to continue up and it is designed to be used with MSI Post Surrounds.
F. Column Stones: Each column stone is custom designed for installation right out of the box. The sizes are 16"x16" / 6"x6" / 5 1/2"x5 1/2".
G. Fireplace Trim Kit: Each section of the trim kit is manufactured with a metal bracket for easier installation. Kit includes a key stone, customizable right and left peripheral stones, and hearth stone. Hearth stone sizes are 12"x20"x2" / 20"x20"x2"/ 24"x24"x2" / 12"x12"x1 1/2" / 16"x20"x2".
H. MSI Receptacle Stone: Brown and gray.
PART 3 EXECUTION
3.1 EXAMINATION
A. Examine surfaces to receive MSI Precast Stone Veneer.
B. Notify Architect of conditions that would adversely affect installation.
C. Do not begin surface preparation or installation until unacceptable conditions are corrected.
D. Do not begin installation until backing structure is plumb, bearing surfaces are level, and substrates are clean and properly prepared.
E. Verify location and secure installation if shelf angles are required.
3.2 SURFACE PREPARATION
A. Exterior Untreated Wood Installation: For exterior untreated wood installation a moisture barrier, such as 15Ibs felt or a synthetic barrier is required.
B. Exterior Treated Wood Installation: No moisture barrier is required when using treated plywood.
C. Interior Wood Installation: No moisture barrier is required.
D. Interior Drywall: MSI veneer stone can be installed over drywall.
1. Hit one stud per stone, OR
2. Use some type of drywall anchor.
E. Block Installation: MSI can be installed over block with a masonry screw to apply stone to block. It is recommended that the block be sealed before MSI veneer stone installation.
3.3 INSTALLATION
A. Starter Strip:
1. New starter strip is to be placed at bottom elevation of project. To install Starter Strip measure up 1 1/2" from the bottom of your project area, chalk a line to mark where your Starter Strip will be installed,. For multiple Starter Strips be sure to continue your line the entire length of the project area. Starter Strip is not always necessary, but the bottom section of the first row of stone may not be as tight as when using the Starter Strip.
2. The screws need to be drilled through the "V" channel of the Starter Strip (d1) and will be drilled directly onto your pre-measured and marked line, placing a screw every 12-16 inches along the Starter Strip. Each strip needs to be leveled.
B. First Row of MSI Precast Stone Veneer:
1. When inside and/or outside corners are present, start with inside corners first, then outside corners., finally fill in between with flats. The first row locks onto the Starter Strip and the stones work better from left to right.
2. At the end of the each row, measure and make the appropriate cut, using the remaining piece to begin next row. Screw into framing members when possible.
C. Following Rows of MSI Precast Stone Veneer:
1. The second row and all following rows will stack and fasten directly onto the previous row of MSI stone. Make cuts as necessary, making sure to stagger each row.
2. Use cut pieces in and throughout the project.
D. Finishing:
1. M-Trim should be considered as the 1st option.
2. Universal Trim: Universal Trim a 2"x20" trim piece. It can be used to finish the top of a project area, to trim around windows and doors, or to butt the stone to another surface. Use a polyurethane construction adhesive to attach the Universal Trim.
3. Piecing the Stone: Cut to height and use a polyurethane construction adhesive to attach the stone. The plastic railing may need to be cut to ensure a tight lock and finish.
In some situations, pre-drilling a hole may be necessary to attach the last course with a mechanical fastener, i.e. galvanized screws. Use coated screws for exterior applications.
E. Cutting and Fitting:
1. MSI can be cut easily with a diamond blade, either by dry cutting or wet. Cut and fit thin veneer stone for chases, pipes, conduit, sleeves, grounds, and other penetrations and adjacent materials.
2. Coordinate with other work to provide correct size, shape, and location.
3.4 CLEANING
A. MSI should only be washed with water. Pressure washing is not recommended.
B. Do not use harsh cleaning materials or chemicals that could damage stone.
C. Do not use metal brushes or acids for cleaning.
3.5 PROTECTION
A. Protect installed MSI precast stone veneer to ensure that, except for normal weathering, stone will be without damage or deterioration at time of Substantial Completion.
B. Touch-up, repair, or replace damaged stone before Substantial Completion.
END OF SECTION
MSI Precast Stone Veneer 04850 (04 40 00) - 7