Technology / Soil Type / Treatment DepthWet and weak fine grained soils / Unsaturated, loose granular soils / Saturated, loose granular soils / 0 – 1.5 m / 1.5 – 3 m / 3 – 6 m / 6 – 15 m / Greater than 15 m
Aggregate Columns / / / / / / /
Blasting Densification / / / / /
Chemical Grouting/Injection Systems / / / / / /
Column-Supported Embankments / / / / / / /
Combined Soil Stabilization with Vertical Columns / / / / / /
Compaction Grouting / / / / / /
Continuous Flight Auger Piles / / / / / /
Deep Dynamic Compaction / / /
Deep Mixing Methods / / / / / /
Electro-Osmosis / / / /
Excavation and Replacement / / / / /
Geosynthetic Reinforced
Embankments / / / / / /
Geotextile Encased Columns / / / /
High-Energy Impact Rollers / / /
Jet Grouting / / / / / /
Lightweight Fill / / / / / /
Micropiles / / / / / /
Prefabricated Vertical Drains and Fill Preloading / / / /
Rapid Impact Compaction / / / / /
Sand Compaction Piles / / / / / /
Vacuum Preloading with and without Prefabricated Vertical Drains / / / / /
Vibrocompaction / / / / /
Vibro-Concrete Columns / / / / / /
Online Resource 4. (Cont.) Project-Specific Selection Decision Matrix (Part 2 of 5)
Technology / Purpose of ImprovementIncrease resistance to liquefaction / Increase strength / Increase bearing capacity / By-pass Soft Ground / Reduce immediate settlement / Seepage Barrier (cutoff wall) / Reduce consolidation settlement / Increase rate of consolidation
Aggregate Columns / / / / / /
Blasting Densification / / / /
Chemical Grouting/Injection Systems / / / / /
Column-Supported Embankments / / / /
Combined Soil Stabilization with Vertical Columns / / / / / /
Compaction Grouting / / / /
Continuous Flight Auger Piles / / / /
Deep Dynamic Compaction / / / /
Deep Mixing Methods / / / / / / /
Electro-Osmosis / / / / /
Excavation and Replacement / / / / /
Geosynthetic Reinforced
Embankments
Geotextile Encased Columns / / / /
High-Energy Impact Rollers / / / /
Jet Grouting / / / / / / /
Lightweight Fill / /
Micropiles / / / /
Prefabricated Vertical Drains and Fill Preloading / / / /
Rapid Impact Compaction / / / /
Sand Compaction Piles / / / / / /
Vacuum Preloading with and without Prefabricated Vertical Drains / / / /
Vibrocompaction / / / /
Vibro-Concrete Columns / / / /
Online Resource 4. (Cont.) Project-Specific Selection Decision Matrix (Part 3 of 5)
Technology / Project Type / Site Characteristics / Size of Area to be ImprovedNew embankment/new construction / Embankment widening / Replacement structure / New Structure (culvert,
wall, etc.) / Existing Structure with Differential Settlement / Large, open, undeveloped sites / Constrained, developed sites / Small
area / Moderate area / Large
area
Aggregate Columns / / / / / / / / /
Blasting Densification / / / / /
Chemical Grouting/Injection Systems / / / / /
Column-Supported Embankments / / / / / / / / /
Combined Soil Stabilization with Vertical Columns / / / / / / / / /
Compaction Grouting / / / / / / / /
Continuous Flight Auger Piles / / / / / / / / /
Deep Dynamic Compaction / / / / /
Deep Mixing Methods / / / / / / / /
Electro-Osmosis / / / / / / / / /
Excavation and Replacement / / / / / / / / /
Geosynthetic Reinforced
Embankments / / / / / / /
Geotextile Encased Columns / / / / / / /
High-Energy Impact Rollers / / / / / / / /
Jet Grouting / / / / / / / /
Lightweight Fill / / / / / / /
Micropiles / / / / / / /
Prefabricated Vertical Drains and Fill Preloading / / / / / / /
Rapid Impact Compaction / / / / / / / / /
Sand Compaction Piles / / / / / / / / /
Vacuum Preloading with and without Prefabricated Vertical Drains / / / / / / / /
Vibrocompaction / / / / / / /
Vibro-Concrete Columns / / / / / / / / /
Online Resource 4. (Cont.) Project-Specific Selection Decision Matrix (Part 4 of 5)
Technology / Project Constraints / Construction schedule / Unstable soil condition that best describes siteLow overhead clearance / Adjacent buildings / Existing utilities / Accelerated schedule / No schedule constraints / Unstable soil extends from ground surface to depth / Unstable soil underlies stable soil / Unstable soils and stable soils are interlayered
Aggregate Columns / / / / / / /
Blasting Densification / / / /
Chemical Grouting/Injection Systems / / / / / / / /
Column-Supported Embankments / / / / / / / /
Combined Soil Stabilization with Vertical Columns / / / / / / /
Compaction Grouting / / / / / / / /
Continuous Flight Auger Piles / / / / / / /
Deep Dynamic Compaction / / /
Deep Mixing Methods / / / / / / /
Electro-Osmosis / / / / / /
Excavation and Replacement / / / / / / /
Geosynthetic Reinforced
Embankments / / / / /
Geotextile Encased Columns / / / / /
High-Energy Impact Rollers / / / /
Jet Grouting / / / / / / / /
Lightweight Fill / / / / / / / /
Micropiles / / / / / / / /
Prefabricated Vertical Drains and Fill Preloading / / / /
Rapid Impact Compaction / / / /
Sand Compaction Piles / / / / / / /
Vacuum Preloading with and without Prefabricated Vertical Drains / / / / /
Vibrocompaction / / / / /
Vibro-Concrete Columns / / / / / / /
Online Resource 4. (Cont.) Project-Specific Selection Decision Matrix (Part 5 of 5)
Technology / Sufficiently thick peat layers are present that will affect construction and settlement1 / Fine grained soils present with shear strengths below25 kPa1 / Obstructions are present which would cause drilling difficulty1
Aggregate Columns
Blasting Densification /
Chemical Grouting/Injection Systems / /
Column-Supported Embankments / /
Combined Soil Stabilization with Vertical Columns /
Compaction Grouting /
Continuous Flight Auger Piles / /
Deep Dynamic Compaction /
Deep Mixing Methods / /
Electro-Osmosis /
Excavation and Replacement / / /
Geosynthetic Reinforced
Embankments / / /
Geotextile Encased Columns / /
High-Energy Impact Rollers /
Jet Grouting / /
Lightweight Fill / / /
Micropiles / / /
Prefabricated Vertical Drains and Fill Preloading / /
Rapid Impact Compaction /
Sand Compaction Piles
Vacuum Preloading with and without Prefabricated Vertical Drains / /
Vibrocompaction
Vibro-Concrete Columns / /
1 All technologies are applicable if the condition is not present
Selection assistance for the evaluation of geoconstruction technologies
Douglas, Schaefer, and BergGeotechnical and Geological Engineering
Caleb Douglas (Corr. Author) Page 1 of 5