Section 16720 (or 13700 / new Masterformat 2004 – Div. 28)

A&E Specifications for Security Communication System

PART 1  : GENERAL

1.01  SUMMARY

A.  Work Included: Provide electronic security communication system in accordance with the Contract Documents. The Contract Documents are as defined in the “Agreement”. The “General Conditions Governing All Contracts” shall apply to all work under the Contract. The Work of this Section shall include but not be limited to the following.

1.  The General Conditions for contracts of construction, referred to in the contract documents as the General Conditions, together with the following articles of the electronic security communication systems specifications, which amend, modify and supplement various articles and provisions of the general conditions, are made part of the Contract and shall apply to all work under the Contract.

2.  All articles or parts of articles of the General Conditions not so amended, modified or supplemented by these electronic security communication systems specifications shall remain in full force and effect. Should any discrepancy become apparent between the general conditions and these electronic security communication systems specifications the Contractor shall notify Engineer, in writing, and the Engineer shall interpret and decide such matters in accordance with the provisions of the General Conditions.

3.  The Contractor shall comply with all applicable governmental regulations, Standards and with all State, County, City, and other applicable codes and ordinances.

4.  These specifications call out certain duties of the Contractor and his suppliers. They are not intended as a material list of items required by the Contract.

5.  These divisions of the specifications cover the electronic security communication systems for the ______(firm name).

6.  It is the intent of these specifications to provide a complete workable electronic security communication system ready for the Owner's use. Any item not specifically shown on the drawings or called for in the specifications, but normally required to conform to the intent, are to be considered as part of the Contract.

7.  Any given item of equipment or material shall be the product of one manufacturer throughout the facility. Multiple manufacturers of any one item shall not be permitted, unless specifically noted otherwise.

8.  These specifications are equipment and performance specifications. Actual installation shall be as indicated on the Drawings. Any discrepancies found between the Specification and the Drawing shall be immediately brought to the attention of the Owner. Installation and details indicated on the Drawings shall govern if they differ from the Specifications.

9.  Certain terms such as "shall, provide, install, complete, start up" are not used in some parts of these specifications. This does not indicate that the items shall be less than completely installed or that systems shall be less than complete.

B.  Utilize the following abbreviations for discernment on the Drawings and within the Specifications:

1.  NEC National Electrical Code

2.  OSHA Occupational Safety and Health Act

3.  ANSI American National Standards Institute

4.  NFPA National Fire Protection Association

5.  IEEE Institute of Electrical and Electronics Engineers

6.  UL Underwriters' Laboratories, Inc.

7.  ASTM American Society of Testing Materials

8.  EIA/TIA Electronic Industries Association / Tele-

communications Industries Association

9.  FCC Federal Communications Commission

C.  Utilize the following definitions for discernment within the Specifications:

1.  "PROVIDE" or "FURNISH" means to supply, purchase, transport, place, erect, connect, test and turn over to Owner, complete and ready for regular operation, the particular work referred to.

2.  "SUPPLY" means to purchase, procure, acquire, and deliver complete with related accessories.

3.  "INSTALL" means to move from property line, set in place, join, unite, fasten, link, attach, set up or otherwise connect together before testing and turning over to Owner of equipment supplied under another division. Installation to be complete and ready for regular operation, the particular work referred to.

4.  "WIRING" or "CABLING" means the inclusion of all fittings, conductors, connectors, connections, termination and all other items necessary and/or required in connection with such work.

5.  "CONDUIT" or "CABLE TRAY" or "LADDER RACK" means the inclusion of all fittings, hangers, supports, sleeves, etc.

6.  "AS DIRECTED" means as directed by the Owner or his representative.

7.  "CONCEALED" means embedded in masonry or other construction, installed behind wall furring or within double partitions, or installed within hung ceilings.

8.  "EXPOSED" means not installed underground or "CONCEALED" as defined above.

9.  "APPROVED" means as accepted and authorized, in writing, by the Owner or Engineer.

10.  "OWNER" means the “Buyer’s Name”.

11.  "ARCHITECT" means “Architect Firm Name”.

12.  "ENGINEER" means “Engineering Firm Name”.

1.02  WORK INCLUDED

A.  Provide labor and materials required to design, procure, deliver, install, test, train, commission, program and place into operation the electronic security communication systems as called for in the contract documents, and according to applicable codes and regulations.

B.  Furnish and install all labor, materials, apparatus, and appliances essential to the complete functioning of the systems described and/or indicated herein, or which may be reasonably implied as essential whether mentioned in the Contract Drawings and Specifications or not.

C.  Work Provided By Electrical Contractor:

1.  The scope of work provided by electrical contractor includes but not limited to: furnishing and installation of conduits, back boxes, cabling and all miscellaneous hardware (whether specified or not) (e.g. nuts, bolts, tie wraps, fasteners, etc.) for all security communication devices in locations shown on Architect/Engineer drawings and/or called for whether in specifications, or Contract, or Request For Proposal, or other documents specifying the scope of work.

2.  Electrical Contractor shall provide dedicated power outlets or J-boxes at locations shown on the Architect/Engineer drawings.

3.  Electrical Contractor shall provide conduits, conduit stub-ups and boxes for all security communication device locations in accordance with drawings and specifications.

4.  Electrical Contractor shall provide power connections from the power outlets to the security communication equipment panels.

5.  The scope of work provided by Electrical Contractor includes grounding. Electrical Contractor shall connect security communication panels to the grounding system in accordance with applicable codes and regulations.

6.  Electrical Contractor shall coordinate locations of electrical boxes and conduit routes with Architect and other trades.

D.  Work Provided By Other Trades:

1.  Operating temperature and humidity shall be provided in accordance with environmental requirements of each product’s specifications as call out in under the “Part 2 – Products.”

2.  All other trades such as Access Control, CCTV, Paging System, Emergency Call System etc. shall provide all necessary cabling and equipment (relay modules, dry contacts etc.) for interface with security communication system as called for in Architect/Engineer drawings and specifications.

1.03  SUBMITTALS

A.  Submit shop drawings, wire markings, all manufacturer's data, samples and test procedure and reports as called for hereinafter. All submissions to be in English Language. All submittals require the approval of Owner/Engineer.

B.  Submit a single guarantee stating that all parts of the work are in accordance with Contract requirements. Guarantee work against faulty and improper material and workmanship for a period of one (1) year from date of final acceptance by the Owner, except that where guarantees or warranties for longer terms are specified herein, such longer term to apply. Within 24 hours after notification, correct any deficiencies, which occur during the guarantee period at no additional cost to the Owner, to the satisfaction of the Owner and Engineer. Obtain similar guarantees from subcontractors, manufacturers, suppliers and sub-trade specialists, if any.

C.  Indemnify the Owner and the Architect/Engineer against loss, liability, damage or expense, including attorneys' fees, in connection with any claim resulting from damage, which may be asserted by any third party.

1.04  OWNER'S MANUALS

A.  General

1.  Submit 2 draft copies of owner's manuals for review. After review by authorized representative, the contractor shall incorporate review comments and submit 6 final copies.

2.  Update manuals with modifications made to system during guarantee period. Provide replacement pages or supplements in quantity stated above.

3.  Assemble owner's manuals into multi-volume sets as necessary and required by the Owner.

4.  Protect each volume with a heavy-duty vinyl plastic binder. Volumes to have plastic printed dividers between major sections and have oversized binders to accommodate up to 2 inch thick set of additional information.

5.  Each binder to be silk-screened with project name and volume title on front cover and binder.

6.  On the first page of each manual identify with project name, manual title, owner's name, engineer's name, contractor's name, address and service phone number, and person who prepared manual.

B.  Operating manual to serve as training and reference manual for all aspects of day-to-day operation of the system. As a minimum include the following:

1.  Sequence of operation for on-line and off-line operating modes. The sequences shall cross-reference the system point names.

2.  System manufacturers complete operating manuals.

C.  Provide maintenance manual to serve as training and reference manual for all aspects of day-to-day maintenance and major system repairs. As a minimum include the following:

1.  Complete as-built installation drawings for each system.

2.  Overall system electrical power supply scheme indicating source of electrical power for each system component. Indicate which components are on emergency power and indicate all battery backup provisions.

3.  Overall system shielding and grounding scheme indicating all major components and ground paths.

4.  Photographs and drawings showing installation details and locations of equipment.

5.  Routine preventive maintenance procedures, corrective diagnostic troubleshooting procedures, and calibration procedures.

6.  Parts lists with manufacturer's catalog numbers and ordering information.

7.  Lists of ordinary and special tools, operating materials supplies and test equipment recommended for operation and servicing.

8.  Manufacturer's operating set up, maintenance and catalog literature for each piece of equipment.

9.  Maintenance and repair instructions.

10.  Recommended spare parts.

11.  Field test reports.

D.  Provide Programming Manual to serve as training and reference manual for all aspects of system programming. As a minimum include the following:

1.  Complete programming manuals, and reference guides.

2.  Details of any special software packages supplied with system.

3.  Information required for independent programming of system.

4.  Point schedule.

5.  Software troubleshooting procedures.

1.05  WORK PERFORMANCE SCHEDULE

A.  A time-phased schedule for delivery, installation, and acceptance of components for the complete system shall be prepared. Submit this schedule to the Owner within thirty (30) days after award of contract. Submit updates and changes to this schedule promptly to the Owner.

B.  Approval of the Owner/Engineer is required.

1.06  MAINTENANCE

A.  Submit an alternate price to perform complete preventative and emergency maintenance of the electronic security communication system in accordance with the Subcontractor's recommended standards and schedule. This price shall be itemized to show material costs and labor costs. This price shall be based upon work being executed during normal working hours but shall include separate emergency call out provisions. Labor, Project Management, Engineering categories must be broken out separately with hourly rates shown. Prices submitted should be based upon current price lists and labor rates, details of which shall be included with the bid.

B.  The maintenance agreement shall indicate one two-year term with three possible one-year extensions, shall state that the response time shall be 24 hours from call by customer. The annual price shall be negotiated 3 months in advance of annual contract expiry and shall be at the mutual agreement of both parties. Variation in annual prices shall reflect only changes in material and labor costs as substantiated by Federal Guideline Consumer Price Indexes.

C.  Notice to terminate the contract will be given by Owner in 30 days prior to termination. Selling of the contract to new maintenance company must be approved by Owner.

D.  QUALITY ASSURANCE

1.  Comply with current governing codes, ordinances and regulations, and all other applicable codes.

2.  Comply with the requirements of agencies or authorities having jurisdiction over any part of the work and secure all necessary permits.

3.  The products shall be compliant with test reports, such as ISO-9001, ISO-9014, UL1950 or CE conforming to the rigid EMC requirements for electromagnetic emissions, immunity and harmonics where applicable.

4.  Where codes or standards are listed herein, the applicable portions apply.

5.  Plans, specifications, codes and standards are minimum requirements. Where requirements differ, apply the more stringent.

6.  Should any change in plans or specifications be required to comply with governing regulations, notify the Architect/Engineer at the time of submitting the bid.

7.  Execute work in strict accordance with the best practices of the trades in a thorough, substantial, workmanlike manner by competent workmen. Provide a competent, experienced full-time Superintendent who is authorized to make decisions on behalf of the Contractor.

8.  Manufacturer Qualifications: The Manufacturer or Supplier fabricating the material or equipment described in this Section must, within the last five (5) consecutive years, have successfully completed in a timely fashion at least two (2) projects similar in scope and type to the required work for this Section.

9.  Installer Qualifications: The Contractor performing the Work of this Section must, within the last five (5) consecutive years, have successfully completed in a timely fashion at least three (3) projects similar in scope and type to the required work for this Section.

10.  The Contractor performing the Work of this Section may demonstrate compliance with the above qualification requirements by demonstrating that it is certified or authorized as an installer by a manufacturer designated as acceptable in these Specifications. A copy of such manufacturer certification or authorizations must be submitted, or verified in writing by the manufacturer.

11.  Equipment and materials supplied shall be complete, model numbers accurate, and the performance shall conform to manufacturer's specifications.

12.  All equipment and materials shall be new and shall conform to applicable codes.

13.  Repair or replace any items damaged during installation.

14.  Procure and pay for all necessary permits, licenses, inspections, and observe any requirements stipulated therein.