EDEWG Change Request #038

This EDEWG Change Request can be found on the PUC website at http://puc.paonline.com/electric/EDI/edewg_download.asp

Requester’s Name:
All EDCs / EDC/EGS Name: / Phone # :
Date of Request: / Affected EDI Transaction Set #(s):
810 LDC / E-Mail Address:
Requested Priority (emergency/high/low): High / Requested Implementation Date:
ASAP / Status:
Implemented in various txns 1/9/2002

Brief Explanation (This will be copied into the description in the Change Control Summary Spreadsheet):

During review of the various implementation guides, items were noticed that require clarification.

Detail Explanation (Exactly what change is required? To which EDEWG Standards? Why?):

------

Submitted by PECO:

810 LDC

Bill Ready – LDC Consolidated Billing – Supplier Switch

PECO does not allow for two ESP’s charges on the LDC consolidated bill. PECO will not place the previous ESP’’s previous charges on the bill. Once the switch has taken place, the old ESP must bill the customer directly for previously unbilled ESP charges. An ESP reversal (BIG08=”17”) will be processed if it is received after the switch; however, a reissue (BIG08=”18”) must be billed to the customer directly by the ESP. When PECO initiates a rebill (BIG08=”00”) as a result of a cancellation (BIG08=”01), a bill window is available for that billing period only.

------

Submitted by UGI

810 LDC

Pennsylvania Notes Section:

Budget Billing UGI – change note to

- Conect UGI supplier information for details on budget billing

------

PPL comments on the 814 IGs

1.  GENERAL comment: Please replace all instances PPL or PP&L with PPL EU in all the IGs.

2.  814ND: Add note to DTM*245 to indicate that as other EDCs begin using the transaction, the document may need to be revised to identify any changes

3.  814R: AMT*7N and AMT*QY segments. The Note for NJ (must be 100%) also applies to PA – add this clarification. This clarification will help new market participants.

4.  814E: AMT*7N and AMT*QY segments. The Note for NJ (must be 100%) also applies to PA – add this clarification. This clarification will help new market participants.

5.  814C: in the ASI and REF*1P segment notes, you indicate PPL will send a reject for SNP response. We will send an accept response in this case.

6.  867IU – Page 9 Notes: PPL EU - Will provide detail interval data using 867IU with BB, SU, and BQ loops. If summary level is requested, will provide an 867MU with BB and SU loops (BPT04 will be “C1”).

------

From EDEWG discussion in April 2001:

In Bill Ready, what cross reference number should be used on a cancel 810 – the cross reference from the original 867 or the cross reference from the cancel 867?

-  PPL EU and PECO – not applicable since the 867 cancel will cancel the original 810 charges

-  GPU – GPU will accept either the original 867 cross reference or the cancel 867 cross reference number.

-  Allegheny – still being developed, plan to follow MD rules. Will support original 867 cross reference

In Rate Ready, what cross reference number is used on a cancel 810 – the cross reference from the original 867 or the cross reference from the cancel 867?

-  Allegheny - BIG05=Cancel 867 BPT02

-  Duquesne - BIG05=Cancel 867 BPT02, REF*OI = BIG02 from original 810

-  GPUE – BIG05=Original 867 BPT02, REF*OI = BIG02 from original 810

-  UGI - BIG05=Original 867 BPT02, REF*OI = BIG02 from original 810

For Change Control Manager Use Only:

Date of EDEWG Discussion: / Expected Implementation Date:

EDEWG Discussion and Resolution:

Changes were posted to List Server. No comments received. This Change Control was implemented in the 1/9/2002 version of the Implementation Guides.

Priority Classifications

Emergency Priority / Implemented within 10 days or otherwise directed by EDEWG
High Priority / Changes / Enhancements implemented with 30 days. The next release, or as otherwise directed by EDEWG
Low Priority / Changes / Enhancements implemented no earlier than 90 days, Future Release, or as otherwise directed by EDEWG

Please submit this form via e-mail to both the PUC at and to the

Change Control Manager, Stephanie Gibson at

Your request will be evaluated and prioritized at an upcoming EDEWG meeting or conference call.