City of Pawtucket Department of Planning and Redevelopment

Application for Façade Improvement Program

To be completed by the Department of Planning and Redevelopment
Application #:______Application given by: ______
Date Reviewed: ______ Receipt of Additional Documentation: ______
Certified Complete Date: ______Certified Complete by: ______

1.  Project Manager:______

Address: ______

Phone #:______E-mail:______

2.  Business Owner (if different from Project Manager):______

Address: ______

Phone #:______E-mail:______

3.  Property Owner (if different from PM):______

Address: ______

Phone #:______E-mail:______

4.  Design Professional:______

Address: ______

Phone #:______E-mail:______

5.  Contractor:______

Address: ______

Phone #:______E-mail:______

6.  Address of premises:______

Assessor’s Plat #:______Lot #:______

7.  Applying for in funds from this Façade Improvement Program? $______.____

8.  Signature of Project Manager:______Date:______

(attesting to all information submitted being true and correct)

9.  Signature of Business Owner (if different from PM):______Date:______

(authorizing modifications to property they may have purchased)

10.  Signature of Property Owner (if different from PM):______Date:______

(authorizing modifications to the property)

Application Checklist

√ / Type of Document / Description
Application / Previous page
Project Description
(Project Manual) / A written narrative describing the work to be performed (provided by the Design Professional)
Economic Benefit / A written narrative describing the ways in which the project will benefit the local economy by hiring Pawtucket residents/business owners, the utilization of minority or women contractors and/or the use of local suppliers (including financing)
Environmental Benefit / A written narrative describing how this project will limit environmental degradation in material acquisition, construction, and operation
Statement of Qualifications / Documentation demonstrating that the Design Professional is qualified to design this project, see “Façade Improvement Rules and Regulations” for further guidance
(provided by the Design Professional)
Conceptual Drawings (Plans) / Drawings that visualize the end product
(provided by the Design Professional)
Construction Schedule / A timeline for when construction can start, how long each phase will take, and when it will be completed
(provided by the Contractor)
Project Budget / Estimate for the total cost of the project, including Building Permit Fee and Design Professional Fees. All construction costs shall be provided by the Contractor
Evidence of a Match / Copy of contract with Architect
Maintenance Plan / A written narrative describing how the improvements will be maintained to avoid deterioration