Section 260543
Underground Ductbanks
2010-11-01 for Electrical Systems
Use this Section where underground ductbanks are required.
This Master Specification Section contains:
.1 This Cover Sheet
.2 Data Sheet - General
.3 Specification Section Text:
1. General
1.1 Related Requirements
1.2 Detail Drawing
1.3 Coordination
1.4 Delivery, Storage and Handling
2. Products
2.1 Materials
3. Execution
3.1 Installation
.4 Detail Drawing:
260543.01 Ductbank Drain Assembly Detail
BMS Basic Master SpecificationAlberta Infrastructure
Master Specification System / Page 0
Section 260543
Underground Ductbanks
Plan No: for Electrical Systems
Project ID: Page 1
1. General
1.1 RELATED SECTIONS
.1 Submittal Procedures: Section013300.
.2 LEED Requirements: Section013518.
.3 Waste Management and Disposal: Section017419.
.4 Service Connections: Division01.
.5 Concrete: Section033000.
.6 Trench Excavating and Backfilling: Section312338.
1.2 DETAIL DRAWING
.1 Following detail drawing is appended hereto and forms part of this Section:
.1 260543.01: Ductbank Drain Assembly Detail
SPECNOTE:Delete Detail Drawing article if the detail is included on drawings.
1.3 COORDINATION
.1 Coordinate manhole elevations with final site elevations as indicated on drawings.
.2 Coordinate work of this Section with work specified in Section 312338.
1.4 DELIVERY, STORAGE AND HANDLING
.1 Separate waste materials for [reuse] [and] [recycling] in accordance with Section 017419 Waste Management and Disposal.
2. Products
2.1 MATERIALS
.1 Conduit:[Galvanized rigid steel] [Rigid polyvinyl chloride] [Rigid fiberglass reinforced epoxy].
.2 Conduit Spacers:fabricated plastic.
.3 Concrete:as specified in Section 033000 and as follows:
.1 Strength:[20] []MPa.
.2 Aggregate Size:20mm maximum.
.3 Colour:[red] [] permanent additive type.
.4 Reinforcing Steel:as specified in Section 033000and as follows:
.1 [] stirrups at [] mm spacing.
.2 [] M continuous bars.
.5 Ductbank Drain Assembly:fabricated [50] []mm PVC drainage assembly with saddle cutouts for each conduit [as indicated in detail 260543.01] [as detailed on drawings].
SPECNOTE:Provide a Ductbank Drain Assembly when ductbank system does not include manholes or another means of draining ductbanks of water.
SPECNOTE:Ductbank Drain Assembly detail may be included as part of this section or on drawings. Edit this Section accordingly.
3. Execution
3.1 INSTALLATION
.1 Install [reinforced] concrete encased underground ductbank[s] [and manholes] at locations indicated on drawings.
.2 Build [ductbank] [and manholes] on undisturbed soil [or on well compacted granular fill not less than 150mm thick].
.3 Install ductbank with a minimum [150] []mm per 30m length slope.
.4 Provide [25] []mm drain holes in bottom of each conduit.
SPECNOTE:Drain holes only required when Ductbank Drain Assembly is used.
.5 Install base spacers at not greater than [1.5] []m intervals.
.6 Install conduit using preformed interlocking rigid plastic intermediate spacers to maintain spacing between ducts at not less than [50] [75] []mm horizontally and vertically.
.7 Stagger joints in adjacent duct layers by [600] [900]mm and make joints watertight.
.8 Use galvanized rigid steel conduit for all bends in excess of [20] [] degrees and for all sections extending above finished grade level.
.9 Use bell ends at duct terminations.
.10 Use conduit to duct adapters when connecting to threaded galvanized rigid steel conduit.
.11 Terminate duct runs with a duct coupling set flush with the end of concrete duct envelope when deadending ductbank for future extension.
.12 Encase ductbank with [50] [75]mm thick concrete envelope.
END OF SECTION
2010-11-01 BMS Version