Duct Sealing Testing Crew Chief

Field Exam/Proctoring Information

General Information:

·  The exam will take approximately 2 hours
·  Site must be approved by CLEAResult
·  The house/job must be an Eversource or National Grid Customer with a duct sealing contract.
·  The customer MAY NOT be a Natural Gas customer of another utility
·  Any type or reason for a third attempt at proctoring for a single individual will cost $200.

Mandatory Conditions for contractor selected site Checklist:

If the site does not meet all of the requirements listed below, the proctor WILL NOT proctor the exam. If you fail to meet the requirements after 2 attempts, the proctoring event will cost $200.
____ No water damage – roof leaks
____ No immediate life-safety hazards, e.g. vermiculite, asbestos, mold, etc.
____ No CO or back-draft
____ Access to attic – any un-heated attic space that has:
·  An access
·  At least 4 ft. of headroom
____ No active knob and tube
____ Electrical power adequate to support contractor’s equipment
Required Equipment Checklist for test house or job site:
Candidates are expected to have all the equipment and materials needed to a home as outlined below. Please check off all boxes to ensure you have everything you need:
Materials:
____ Bags for clean-up
____ Duct (only if job requires)
Tools:
____ Flashlight
____ Personal Safety Equipment
Sealing Equipment
Equipment:
____ Combustion safety testing equipment
____ Pressure probe
____ Drill and drill bit
____ Probe
____ Digital manometer
____ True flow plate

To schedule a proctoring exam through CLEAResult, please use the CLEAResult Proctoring Request Form. If you need a copy of that form, please contact

Duct Sealing Testing


Field Proctoring Request Form

All Duct Sealing Testing training must be completed before the field exam is scheduled.

Contact Information:

Primary Contact’s Name: /
Primary Contact’s Mobile: /
Primary Contact’s Email: /
Candidate Name: /
Candidate’s Mobile: /
Retest (please check one) / Yes No /

Exam Location Options (please check your preferred exam location):

Contractor Selected Job Site:
Note:
·  Site must be approved by CLEAResult
·  Site must have a Duct Sealing contract.
·  Job Location must be NGRID or Eversource customer /

Contractor Site Location Information (only if this option selected above):

/ Job location site address: /
/ Date Requested: /
/ Site ID# (only if currently working in Mass Save program): /
Address to Mail Authorization Certificate(s):

______
______
Please return this completed form to