RFP Questions

Day 1 – Tuesday, March 8, 2016:

1.  Model Core Switches and location?

a.  WHS – 4506 or/ 3750

Location / MDF Router
High School / Cisco WSC 3850-48PS-S
WJH-West / Cisco WSC 3850-48PS-S
WJH-East / Cisco WSC 3850-48PS-S
Schultz Junior High / Cisco WSC 3850-48PS-S
Roberts Road / Cisco WSC 3850-48PS-S
Jones / Routes at Core 4510R+E
FSE / Routes at Core 4510R+E
HES / Cisco WSC 3850-48PS-S
TES / Cisco WSC 3850-48PS-S

2.  IDF 200 - what Gig is required on quote?

a.  Minimum 2 to 10G

b.  4 is fine to quote

3.  Stadium – 1 or 2 stack groups?

a.  2 stack groups

4.  RRE Elementary – 3850?

a.  We want router functionality

b.  Static Routing

5.  RRE – MDF, 10G 3850? (page 3)

a.  We have 1G

b.  We already have the 3850 and will need the line card to go to 10G

6.  Red Lined Core Switches?

a.  All listed on paper as MDF – what your seeing is not he core it is the extra port count needed to MDF

7.  10 BCU, 10 Meter MDF? (page 6)

a.  2 meter cable to link back to core – change quantity to 2 on cable

8.  MDF? (page 8)

a.  3850 Full POE

9.  Gave a listing of All Campuses

a.  Full Capability – 370 watt power needs to be 740 Watt

b.  Please quote as full power 740 watt

RFP Questions

Day 2 – Friday, March 11, 2016:

1.  What is the install date for the Model Core Switches?

a.  Install date – Summer 2016

2.  Will we go OSPF?

a.  Not at this time. It is set for the static routing

3.  POE?

a.  Full POE+ across all ports

4.  Redundant power supplies?

a.  2

5.  Maximum number of stacked switches with Cisco?

a.  4

6.  Are all schools VLaned?

a.  Yes. Each school has its own and voice vlan as well.

7.  Are closets dual connections to MDF?

a.  Yes