Naval Tayde Mobile: +971 - 557846178 ~ E-Mail:

Seeking assignments in Project Management/ Operations & Maintenance/ Erection & Commissioning with an organisation of repute in Construction Industry.

Executive Summary

PMP Trainedresult driven professional with 10years ofexperience in Project Management, Site Administration, Operations & Maintenance and Erection & Commissioning in Construction Industry..

Proficient in implementing all the aspect of quality management system in order to deliver quality installation in accordance with the contract documents, relevant international standards and local authorities requirements.

Proficient in managing complete project operations entailing planning, resource utilization, installation, commissioning and maintenance.

Project Execution, Commissioning (EPC-Projects).

An effective communicator with strong analytical, problem solving & organisational abilities.

Core Competencies

Developing project baselines and monitoring and controlling projects with respect to cost, resource deployment, time over runs and quality compliance to ensure satisfactory execution of projects.

Planning the execution of work and executing the same as per approved plans, drawings and contract specifications in an effective manner.

Organizing project proposals including estimates, preliminary budgets, Project Schedule & timing.

Liaising with External Agencies for techno-commercial negotiation, preparing tender/contract documents, cost estimates, including billing, variation/deviation proposals, claims, etc. for sub-contractors.

Ensuring execution of various commercial activities within set time, quality, terms and conditions.

Technical Proficiency

Building Management System

Sauter and Johnson Control building solution envision of BACtalk system based on the BACnet standard

Monitoring and controlling of HVAC equipment like FCU, AHU, Chillers, Pumps, etc

Installation, Commissioning and maintenance of field sensors like temperature/pressure/humidity sensors, actuators for valves and shafts, thermostats, etc.

Integration with other systems including Chillers Management System, Fire Alarm System, Central Battery System, etc.

Fire Alarm System

Addressable Fire Alarm Panel with smoke detection and heat detection.

Integration with life safety system like HVAC, Audio Visual and Access control System and Lifts.

Sequencing of operations for HVAC systems through motorized dampers and relays for fired case.

Low Current System

Access Control System, CCTV System, MATV System, Public Address and Voice Evacuation System, Telephone and Data Communication System

Electrical System

Reviewing of all the electrical drawings.

Selection of Cables and Wires

Career Contour

AL NABOODA MEP., Dubai (UAE) Sr. Project Engineer SEPT’13 Till Date

Key projects handled:

Project:Emirates Flight Catering Expansion, Landmark HQ, Bright Start Beach Resort (Four Seasons).

Duration:Sept’13-Till date

Accountabilities:

Independently designs building automation systems for large and/or complex buildings consisting of mechanical system layouts, electrical drawings, bill of materials, sequence of operations, valve and damper schedules, DDC panel layouts to meet the intent of the project plans, specifications and contract documents.

Designs mainly large complex building automation network architecture to support operator workstations, DDC field panels, third-party integration devices connected through LON, Ethernet, or BACNET.

Analysing plans, construction contract specifications and codes to determine project requirements and risks.

Generating DDC point database on all projects. Provides start-up and checkout documentation to the Project Manager and system specialist for use in commissioning and validation.

Prepared engineering re-estimate and follows up with appropriate sales and management to assure understanding of and satisfaction with job scope.

Prepared specifications and drawings for special components and panels purchased from outside suppliers. Selects proper types and sizes of company products and outside suppliers to meet project requirements. Prepares all information on pre-installation extras or change orders to submit to customer or general/ subcontractor.

Oversee the creation of system graphics. Ensures the job folder is organized and maintained including all pertinent job related information. Orders and tracks all required products and materials for timely delivery on the job site.

Responsible for aspects of project management and implementation of BMS projects for HVAC, ventilation, and lighting systems, systems integration and/or programming

Identifies problems in existing BMS and formulates solutions to fix BMS problems.

Outlines procedures that ensure sensor and actuator accuracy and precision, proper operation of the overall system, and repair/replacement of any malfunctioning components.

ETA M&E., Dubai (UAE) Sr. ELV Engineer AUG’11 Till AUG’13

Key projects handled:

Project:Dubai Airport Coucourse-3

Duration:Aug’11-Till date

Accountabilities:

Plans, schedules, conduct, and coordinate assigned engineering work

Ensures effective communication and coordination on assigned projects between all disciplines and all other project participants

Day-to-day interaction with the Client’s designated representative as well as coordination of all internal activities

Float enquiries, technical & commercial evaluation of offers, negotiation, prepare purchase order, commercial contracts

Factory inspection and expediting of project equipment

Participating in Client/contractor meetings and resolving Client/engineering and management project issues.

Voltas International Ltd., Dubai (UAE) ELV Engineer June’08 Till July’11

Key projects handled:

Project:Ferrari Experience, K Race Track, Etihad Tower, (Abu Dhabi), Oceana Movenpick (Dubai)

Duration:June’08-Till date

Accountabilities:

Provide supervision for the installation work in term of proper method,

Maintained a close supervision with various disciplines, main contractors and sub-contractors regarding the installation methodologies before installation.

Pivotal in ensuring that the construction issued drawings are as per scope of works.

Ensured the adherence to the HSE requirements a the project site.

Chalked out daily, weekly and monthly progress reports and reported the same to Project Manager.

Float enquiries, technical & commercial evaluation of offers, negotiation, prepare purchase order, commercial contracts

Factory inspection and expediting of project equipment

Handle problem escalation and address performance issues with vendors

Sauter Race Technologies, Chennai (India) Project Engineer June’04-April’08

Key projects handled:

Project:Stada VN Joint Venture (Ho Chi Minh City, Vietnam)

Duration:May’07-Jan’08

Accountabilities:

Monitors work for compliance to applicable codes, accepted engineering practices

Coordination of all technical activities on assigned projects.

Responsible and accountable to ensure that all assigned personnel are coordinating their activities with other project participants, and that the requirements of the Contract are being satisfied

Monthly project status reports.

Preparing documents for 21CFR validation.

Project:ADP Pvt. Ltd. (Hyderabad, India)

Duration:July’06-March’07

Accountabilities:

Planning & supervise the execution of IntegratedBuilding Management System.

Assisting and co-ordination for commissioning activity.

Day-to-day interaction with the Client’s designated representative as well as coordination of all internal activities

Monthly project status reports.

Troubleshooting of IBMS system.

Project:Cadila RD (Ahmedabad, India), Zydus Oncology (Ahmedabad, India)

Duration:May05-June’06

Accountabilities:

Managing the installation of Building Management System for the entire plant.

Handling the pre-commissioning and co-ordination for commissioning activity.

Project:Watson Pharma (Goa, India)

Duration:June’04-April’05

Accountabilities:

Assisting project engineer during installation of Building Management System.

Arranging technical submittals review it and send it to consultant.

Monthly project status reports.

Audit Handled

SAS-70 for ADP Pvt. Ltd.(India) for the year 2006.

U.S. FDA audit for BAFNA PHARMA, Chennai (India) for the year 2007.

World Health Organization Audit for STADA VN Joint Venture, (Vietnam) for the year 2008.

Accolades

Selected for execution of overseas project and led a team of 100 members for project execution in Stada VN Joint Venture, Ho Chi Minh City (Vietnam) during 2007.

Given an opportunity to execute a fast track turnkey project and led a team of 30 members for project execution in ADP Pvt Ltd, Hyderabad (India) during 2006.

Bagged the highest grade among trainees and & chosen to lead a team of trainees for the installation of Integrated Building Management System for commercial buildings in 2005.

Academic Credentials

2004B.Tech. (Electrical & Electronics Engineering) from National Institute of Technology, Tiruchirappalli (Tamil Nadu, India)

199912th from Sub Lt. Vivek Pimplikar Junior College, Achalpur (Maharashtra, India)

199710th from Subodh High School, Achalpur (Maharashtra, India)

IT Skills

Packages:MS Office, Basics of Programming Language

Building Controls Open Systems, BACnet, Modbus, NOVA PRO OPEN.

Aconix

Conferences Attended

Tata Code Of Conduct (TCoC)

Negotiation Skill

Communication Skill.

ISO Awareness.

Student Events

Gold medallist in inter NIT cricket tournaments at NIT,Trichy.

First runners-up during NITFEST for picture collage (Team of 2).

First runners-up for making back drops for NITFEST'04 (Team of 9).

Participated for various activities of Child Relief and You in NIT TRICHY during 2000-2004.

Personal Dossier

Date of Birth:19th July 1981

Address:214#Al Zarooni Building, Mankhool, UAE

Driving Licence:UAE Driving Licence