SCHEDULE A

SERVICES (Continued)

/ Ministry of
Forests, Lands and
Natural Resource Operations / Schedule A - Services

To automatically go to "Fill In" areas for required information press PF11

NOTE: Magenta text is used for areas where information is required
Blue text is for Optional
Hidden Instructional text is in Red

REMEMBER: Always delete the Hidden Text once the form has been completed otherwise the hidden text could appear on the electronic version of the form.

File:

Attachment to the Agreement with for .

1.  THE SERVICES

1.01  The Contractor shall provide the following Services:

[Note to Contract Manager: the following should be considered. Refer to Chapter 9 of the CMM for assistance and optional clauses for consideration:

·  Include detailed description of all aspects of the services to be provided. List the deliverables or services purchased, including delivery schedule, formats, quantity and specific or technical requirements and standards to be met. Include work quality, work locations, maps, drawings, guidebook, etc. Avoid ambiguity, be measurable.

·  Include the resource commitments to perform the Services by including staff qualifications and time, materials, equipment, facilities. Extract inputs from the proposal, a statement of work or as negotiated.

·  Use mandatory language: “The Contractor must…”

·  Include reporting requirements, formats, instructions, and frequency (delivery dates and quantities)

·  Include how and when the ministry will inspect the project/services performed and remedies or consequences if standards are not met.

·  Include the expected results (outcomes) of the services being provided.]

(a) 

(b) 

(c) 

2.  KEY PERSONNEL(this is an optional Section to be placed at the end of the schedule - delete cell if not applicable)

The Services shall be performed by the following “Key Personnel”:

· 

· 

and there shall be no substitution for the person(s) listed above without the prior consent of the Province.

[Note to Contract Administrator: the FS1 (Clause 16.05) has been updated to include requirement to comply with the Subcontractors Schedule if attached. Reference to subcontractors is no longer placed in this schedule. Attach the FS999 – Subcontractors Schedule to the Agreement if required.]

(Note to Contract Administrator: if this contract has been advertised as an option-to-renew contract, insert new heading “OPTION TO RENEW”, sequentially number the section, and insert the clause found in Chapter 9.12.1 of the Contract Management Manual.)

(Note to Contract Administrator: if this contract is for the services an engineer, architect, landscape architect, surveyor, construction and project manager, applied science technologist, and geoscientist only (not for any other professional), insert new heading “CONSULTING AND PROFESSIONAL INDEMNITY”, sequentially number the section, and insert clause found in Chapter 8.8.4 of the Contract Management Manual.

FS1-A Services Schedule CSNR-MFLNR Rev April 1, 2013 Page 2 of 2

(g:\!workgrp\hfmfsic\0755 - forms\contract management forms\intranet\fs1-a.doc)