  1. Background

This CCG was one of the first to go-live with EPS and switched on 11% or 5 out of 45 practices in late 2011 to early 2012.

A year after the first practices went live, gradual roll-out of EPS was extended throughout the CCG and by August 2014, 93% or 42 out of 45 practices were using the service. At the same time, feedback from end users suggested a number of issues had arisen since go-live at many sites. These included issues such as staff turnover, incomplete knowledge of the service and the availability of supporting tools and resources.

  1. Utilisation activities

One-day utilisationworkshop held in August 2014 with the aimof improving operational knowledge in order to increase usage across the area.

3. Statistics

Below is a summary of the change in usage trends within the CCG since work to improve utilisation took place:

  • Overall utilisation for the CCG increased by 9% from 27% to 36% since August 2014. The graph shows the trend over time.

Individual practice level:

  • Live practices showed an average 1% increase in usage each month from go-live until August 2014. Since utilisation work in August 2014, this rate of change increased to 2% on average each month.
  • The actual percentage change of practice usage since the utilisation workshop, ranged from a decrease of 23% to an increase of 60%, averaging out to a 7% increase overall.
  • The number of practices with high usage(over 50%)increased by 14%, while the number with low usage(less than 25%) decreased by 12%.

The example chart below shows the number of practices before the Utilisation Workshop (August 2014) and after (December 2014) with utilisation rates of under 25%, 25 – 49% and over 50%.

4. Conclusions

There has been a significant (9%) improvement in average usage across XXXXX CCG since the event.

The rate at which usage is increasing each month has doubled from 1% to 2%.

5. Next steps

  • For low – medium performing sites, supplement utilisation workshop events with individual utilisation site visits.
  • Review and report changes in CCG usage, three or more months after the utilisation workshop.