ATTACHMENT B
REVISED (AUGUST 1, 2014)
ALL COSTS FOR THIS ATTACHMENT (SECTIONS I-IV) SHOULD BE INCLUSIVE OF
MARKETING AND OTHER COSTS RELATED TO THE PROPOSED PRICING.
FOR SCORING PURPOSES THE VENDOR SHALL PROVIDE COSTS FOR ALL SECTIONS AND ALL ITEMS/CELLS INCLUDED IN THE COST FORMS BELOW
NG-KIH Cost Form
Section I – Construction and Leased Dark Fiber Deployment Costs - Assume Commonwealth Ownership for Constructed Segments
Each backbone segment shall be quoted using the following Commonwealth parameters:
· Each segment shall initiate/terminate in a Commonwealth location/facility within the hub city shown in the table below.
· The cost of constructed fiber optic segments shall be based on either 144 or 288 strands of fiber - specified in column 2 of the table below.
· The cost of each leased fiber segment shall be based on 24 strands of fiber.
· For all leased segments, (for information purposes) the vendor shall indicate if the leased fiber is available now or will be available within 18 months - last 2 columns of the table below.
· For segments 22 – 24, the following definitions apply:
o CDC – Commonwealth Data Center
o BNGC – Boone National Guard Center
SegmentNumber / Strand Count / From / To / Cost to
Construct / Monthly Cost to
Lease over a 20 year term / Lease/IRU Available Now? –
Yes or No / Lease/IRU Available in 18 Months? - Yes or No
1 / 288 / Cincinnati / Georgetown
2 / 288 / Georgetown / Lexington
3 / 288 / Lexington / Richmond
4 / 288 / Richmond / Somerset
5 / 288 / Somerset / London
6 / 288 / London / Williamsburg
7 / 144 / Lexington / Winchester
8 / 144 / Winchester / Morehead
9 / 144 / Morehead / Ashland
10 / 144 / Ashland / Paintsville
11 / 144 / Paintsville / Prestonsburg
12 / 144 / Prestonsburg / Hazard
13 / 144 / Hazard / Manchester
14 / 144 / Manchester / London
15 / 144 / Prestonsburg / Pikeville
16 / 144 / Pikeville / Harlan
17 / 144 / Harlan / Pineville
18 / 144 / Pineville / Corbin
19 / 144 / Corbin / London
20 / 144 / Ashland / Maysville
21 / 144 / Maysville / Highland Heights
22 / 144 / Highland Heights / Cincinnati
23 / 288 / Lexington / Frankfort
CDC
24 / 288 / Frankfort CDC / Frankfort
BNGC
25 / 288 / Frankfort
BNGC / Louisville
26 / 288 / Louisville / Cincinnati
27 / 144 / Louisville / Elizabethtown
28 / 144 / Elizabethtown / Bowling Green
29 / 144 / Bowling Green / Glasgow
30 / 144 / Glasgow / Somerset
31 / 144 / Bowling Green / Hopkinsville
32 / 144 / Hopkinsville / Murray
33 / 144 / Murray / Paducah
34 / 144 / Paducah / Madisonville
35 / 144 / Madisonville / Henderson
36 / 144 / Henderson / Owensboro
37 / 144 / Owensboro / Louisville
Total Cost to Construct the NG-KIH Backbone Segments
Add Construct column (cells 1-37) and enter total here $______
Total Cost to Lease the NG-KIH Backbone Segments
Add Lease column (cells 1-37) and enter total here $______
Backbone Operations & Maintenance Cost
The vendor should also quote the monthly operations and maintenance cost to operate the entire NG-KIH backbone. $______
NG-KIH Cost Form
Section II – Deployment Cost for Community Anchor Priority Locations
Using the spreadsheet link below, the vendor shall complete all cells in column H (Lease/IRU) and column I (Construct (NRC)) for each of the Community Anchor priority sites listed. Provide the completed spreadsheet as an attachment in each of the six (6) cost proposal CDs.
Community Anchors Worksheet 070814
The Commonwealth will add the cost for each location to arrive at the Total Cost for connecting these community anchor locations to the NG-KIH backbone.
NG-KIH Cost Form
Section III– Services Rate Schedule
The following service rate schedule shall be completed and will apply to the monthly costs for the connectivity, operations and maintenance of the NG-KIH environment. This includes:
· NG-KIH Backbone Segments 1 - 37
· All Institutions outlined in spreadsheet link, Endpoints Work Sheet 070814
· All subsequent endpoints required to connect other stakeholder/customer sites outlined in Section 2 of this RFP
In providing the required cost quotes in the table below, consider the Commonwealth’s one-time financial contribution outlined in row 2 of the following table for costs entered in each column.
Column A / Column B / Column C / Column DCommonwealth Financial Contribution / $0 / $20M / $40M / $60M
100 Mbps
250 Mbps
1 Gbps
10 Gbps
100 Gbps
Column Subtotal
Total of all Columns $______
KIH Cost Form
Section IV - Network Operations and Professional Services Costs
Pricing Schedule for Post Backbone Implementation Services (for 5 years)
Professional Services ScheduleFully Loaded Hourly Rates / Costs
Engineering Services
Project Management Services
Communications and Marketing Services
Technical Support
Operations Support
Training Services
Break/Fix and Troubleshooting Services