U.S. DEPARTMENT OF AGRICULTURE TC-4
Natural Resources Conservation Service Section IV
Tennessee – Rev. 4– May 7, 2003
TABLE OF CONTENTS
SECTION IV
PRACTICE NAME AND UNIT
/Practice Code
/Date of Last Revision
/Last STGC Review Date
Access Road (Feet)
/560
/05/02
/12/10/02
Agrichemical Handling Facility-Interim (No.)
/203
/06/98
/Brush Management (Acre)
/314
/09/96
/Clearing and Snagging (Feet)
/326
/06/89
/Closure of Waste Impoundments (No.)
/360
/08/00
/Composting Facility (No.)
/317
/05/02
/04/17/02
Conservation Cover (Acre)
/327
/05/88
/Conservation Crop Rotation (Acre)
/328
/05/07/03
/12/10/02
Constructed Wetland (No.)
/656
/09/02
/04/17/02
Constructed Wetland Documentation Requirements
/656
/09/02
/04/17/02
Contour Buffer Strip (Acre)
/332
/05/07/03
/12/10/02
Contour Farming (Acre)
/330
/05/87
/Cover and Green Manure Crop (Acre)
/340
/04/88
/Cover Crop Fact Sheet
/340
/01/04/03
/12/10/02
Critical Area Planting (Acre)
/342
/01/89
/Cross-Slope Farming – Interim (Acre)
/330-A
/09/89
/Dam Diversion (No. or Ft.)
/348
/10/02
/04/17/02
Dike (Feet)
/356
/06/89
/Diversion (Feet)
/362
/05/02
/04/17/02
Dry Hydrant (No.)
/432
/08/00
/Early Successional Habitat Development/Mgt. (Acre)
/647
/05/02
/04/17/02
Fence (Feet)
/382
/04/29/03
/12/10/02
I. Barbed Wire Construction Specifications
/CS-382
/04/29/03
/12/10/02
II. Woven Wire Construction Specifications
/CS-382
/04/29/03
/12/10/02
III. Permanent Electric High Tensile Construction
Specifications
/CS-382
/04/29/03
/12/10/02
IV. Permanent Non-electric High Tensile
Construction Specifications
/CS-382
/04/29/03
/12/10/02
V. Temporary Construction Specifications
/CS-382
/04/29/03
/12/10/02
Field Border (Feet)
/386
/07/99
/Field Border for Wildlife Jobsheet
/386
/01/03
/12/10/02
Filter Strip (Acre)
/393
/06/02
/12/10/02
Firebreak (Feet)
/394
/08/89
/Fishpond Management (No.)
/399
/04/79
/Forage Harvest Management (Acre)
/511
/09/97
/Forest Harvest Trails and Landings (Acre)
/655
/09/96
/Forest Site Preparation (Acre)
/490
/08/89
/PRACTICE NAME AND UNIT
/Practice Code
/Date of Last Revision
/Last STGC Review Date
Forest Stand Improvement (Acre)
/666
/06/02
/04/17/02
Forest Trails and Landings (Acre)
/655
/06/02
/04/17/02
Grade Stabilization Structure (No.)
/410
/08/00
/Grassed Waterway (Acre)
/412
/10/02
/04/17/02
Heavy Use Area Protection (Acre)
/561
/10/02
/04/17/02
Hedgerow Planting (Ft.)
/422
/06/02
/04/17/02
Hedgerow Planting Specification Sheet
/422
/06/02
/04/17/02
Hedgerow Planting Documentation Requirements
/422
/06/02
/04/17/02
Incinerator (Interim) - No.
/769
/05/02
/04/17/02
Irrigation Land Leveling (Acre)
/464
/06/89
/Irrigation Storage Reservoir (No./Ac.-Ft.)
/436
/10/02
/04/17/02
Irrigation System, Microirrigation (No./Ac.)
/441
/10/02
/04/17/02
Irrigation System, Sprinkler (No./Ac.)
/442
/10/02
/04/17/02
Irrigation System, Tailwater Recovery (No.)
/447
/09/99
/Irrigation Water Conveyance – Nonreinforced
Concrete Ditch and Canal Lining (Ft.) /428-A
/06/89
/IRRIGATION WATER CONVEYANCE–PIPELINES
/ / /Aluminum Tubing Pipeline (Ft.)
/430-AA
/10/78
/Asbestos-Cement Pipeline (Ft.)
/430-BB
/04/82
/Nonreinforced Concrete Pipeline (Ft.)
/430-CC
/04/82
/High Pressure, Underground,
Plastic Pipeline (Ft.)
/430-DD
/06/89
/Low Pressure, Underground
Plastic Pipeline (Ft.) /430-EE
/06/89
/Reinforced Plastic Mortar Pipeline (Ft.)
/430-GG
/04/82
/Irrigation Water Management (Acre)
/449
/06/02
/04/17/02
Land Clearing (Acre)
/460
/10/77
/Land Reclamation, Fire Control (No.)
/451
/06/89
/LAND RECLAMATION
/ / /Shaft and Adit Closing (No.)
/452
/06/89
/Landslide Treatment (No./Acre)
/453
/06/89
/Toxic Discharge Control (No.)
/455
/06/89
/Highwall Treatment (No./Ft.)
/456
/06/89
/LAND RECONSTRUCTION
/ / /Mined Land (Acre)
/543
/06/81
/Currently Mined Land (Acre)
/544
/06/81
/Land Smoothing (Acre)
/466
/06/89
/PRACTICE NAME AND UNIT
/Practice Code
/Date of Last Revision
/Last STGC Review Date
Lined Waterway or Outlet (Feet)
/468
/10/02
/04/17/02
Manure Transfer (No.)
/634
/08/00
/Mulching (Acre)
/484
/05/72
/Nutrient Management (Acre)
/590
/01/03
/12/10/02
Obstruction Removal (Acre)
/500
/05/02
/04/17/02
Open Channel (Feet)
/582
/03/89
/Pasture and Hay Planting (Acre)
/512
/08/02
/12/10/02
Pest Management (Acre)
/595
/08/02
/04/17/02
Pipeline (Feet)
/516
/05/02
/04/17/02
Pond (No.)
/378
/08/00
/POND SEALING OR LINING
/ / /Flexible Membrane (No.)
/521-A
/ 10/02 /04/17/02
Soil Dispersant (No.)
/521-B
/10/02
/04/17/02
Bentonite Treatment (No.)
/521-C
/10/02
/04/17/02
Prescribed Burning (Acre)
/338
/09/96
/Prescribed Grazing (Acre)
/528A
/05/07/03
/12/10/02
Prescribed Grazing Documentation Requirements
/528A
/09/06/02
/12/10/02
Pumping Plant (No.)
/533
/10/02
/04/17/02
Regulating Water in Drainage System (Acre)
/554
/10/77
/Residue Management, No-Till and Strip Till (Ac.)
/329A
/05/07/03
/12/10/02
Residue Management, Mulch Till (Acre)
/329B
/05/07/03
/12/10/02
Residue Management, Ridge Till (Acre)
/329C
/09/96
/Residue Management, Seasonal (Acre)
/344
/05/87
/Riparian Forest Buffer (Acre)
/391
/05/07/03
/04/17/02
Riparian Herbaceous Cover (Acre)
/390
/05/07/03
/12/10/02
Roof Runoff Structure (No.)
/558
/05/02
/04/17/02
Row Arrangement (Acre)
/557
/10/77
/Sediment Basin (No.)
/350
/10/02
/04/17/02
Shallow Water Management for Wildlife
/646
/05/02
/04/17/02
Spoil Spreading (Feet)
/572
/10/77
/Spring Development (No.)
/574
/10/02
/04/17/02
Streambank and Shoreline Protection (Feet)
/580
/10/02
/04/17/02
Stream Channel Stabilization (Feet)
/584
/10/77
/Stream Crossing – Interim (No.)
/576
/05/96
/Stripcropping, Contour (Acre)
/585
/11/83
/Stripcropping, Field (Acre)
/586
/04/88
/Structure for Water Control (No.)
/587
/10/02
/04/17/02
Subsurface Drain (Feet)
/606
/06/89
/PRACTICE NAME AND UNIT
/Practice Code
/Date of Last Revision
/Last STGC Review Date
SURFACE DRAINAGE
/ / /Field Ditch (Feet)
/607
/10/78
/Main or Lateral (Feet)
/608
/10/02
/04/17/02
Terrace (Feet)
/600
/10/88
/Treatment of Poultry Litter with Alum (Tons) Interim
/629
/10/02
/04/17/02
Tree/Shrub Establishment (Acre)
/612
/06/02
/04/17/02
Underground Outlet (Feet)
/620
/05/02
/04/17/02
Use Exclusion (Acre)
/472
/06/71
/Vertical Drain (No.)
/630
/10/77
/Waste Field Storage - Interim (No.)
/749
/05/02
/04/17/02
Waste Storage Facility (No.)
/313
/08/00
/Waste Treatment Lagoon (No.)
/359
/08/00
/Waste Utilization (Acre)
/633
/10/02
/04/17/02
Wastewater Treatment Strip (Acre)
/635
/05/02
/12/10/02
Water and Sediment Control Basin (No.)
/638
/10/02
/04/17/02
Watering Facility (No.)
/614
/05/02
/04/17/02
Water Well (No.)
/642
/10/02
/04/17/02
Well Decommissioning (No.)
/351
/12/96
/Wetland Restoration (Acre)
/ 657 /05/94
/Wetland Wildlife Habitat Management (Acre)
/644
/09/02
/04/17/02
Wetland Wildlife Habitat Mgt. Documentation Requirements
/ /09/02
/04/17/02
Wildlife Upland Habitat Management (Acre)
/645
/07/91
/Wildlife Watering Facility (No.)
/648
/07/99
/