1.Main data

1.1.Projectinformation
ProjectReference Number / Pre-filled from AF / Projectacronym / Pre-filled from AF
Project Partner 1
(officialnamein English) / Pre-filled from AF
Startingdateof the project / Pre-filled from AF / Enddate of theproject / Pre-filled from AF
Reporting period / Periodx / Programme Specific Objective / Pre-filled from AF
From / dd/mm/yyyy / To / dd/mm/yyyy
Finalprogressreport / Yes ☐ No ☐

2.Activity Report

2.1 Highlights of the main achievements (from start)
2.2 Lessons learned for the partnership and governance of the PA
Please describe (if applicable) encountered difficulties and solutions found during this reporting period in relation to partnership performance and governance of the PA, and explain how you plan to integrate the gained insights into future operations.
2.3 Project implementationand spending
2.4Contribution to promotion of equal opportunities and non-discrimination and equality between men and women
2.5Contribution to sustainable development
2.6 Progress in implementation of actions in the field of social innovation (where applicable)
2.7Other issues

1

ThisdocumenthasbeengeneratedautomaticallybasedonthedatarecordeduntilDD/MM/YYYYHH:MM(CET)

3.Progress on project objectives

3.1 Objectives reached and main project outputs delivered
3.1.1 Project specific objectives
What is the progress towards the achievement of the specific objectives, as defined in the application form?
The information provided should be cumulative.
Project specific objectives / Level of achievement / Explanations
Specific objective 1
(pre-filled from AF) / Drop down list:
Fully achieved, to a large degree, partly achieved, to a minor degree, not achieved (default: blank field)
Specific objective 2
(pre-filled from AF) / Drop down list:
Fully achieved, to a large degree, partly achieved, to a minor degree, not achieved (default: blank field)
Specific objective 3
(pre-filled from AF) / Drop down list:
Fully achieved, to a large degree, partly achieved, to a minor degree, not achieved (default: blank field)
3.2 Overview of project main outputsachievement
Project's contribution to programme output indicators / Sum of output indicator targets / Sum of achieved output indicators reported so far / Project main output number / Project main output (title) / Project main output quantification (target) / Planned delivery month / Achieved so far (cumulative for the entire project including current period) / Level of achievement (cumulative for the entire project including current period)
Programme output indicator 1
Pre-filled from AF / Pre-filled from AF / Automatically calculated / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated from data in WPs / Automatically inserted from WPs
Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated from data in WPs / Automatically inserted from WPs
Programme output indicator 2
Pre-filled from AF / Pre-filled from AF / Automatically calculated / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated from data in WPs / Automatically inserted from WPs
Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated from data in WPs / Automatically inserted from WPs
Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated from data in WPs / Automatically inserted from WPs
Programme output indicator 3
Pre-filled from AF / Pre-filled from AF / Automatically calculated / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated from data in WPs / Automatically inserted from WPs
Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated from data in WPs / Automatically inserted from WPs
Programme output indicator 4
Pre-filled from AF / Pre-filled from AF / Automatically calculated / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated from data in WPs / Automatically inserted from WPs
3.3 Target groups reached
Target groups / Target value / Target groups reached in previous reporting periods / Target group reached in this reporting period / Source of verification / Target groups reached so far values (in %)
Target group type 1
(automatically inserted from AF) / Automatically inserted from AF / Automatically inserted from previous reports / Automatically calculated
Description of the target group involvement
Target group type 2
(automatically inserted from AF) / Automatically inserted from AF / Automatically inserted from previous reports / Automatically calculated
Description of the target group involvement
Target group type n
(automatically inserted from AF) / Automatically inserted from AF / Automatically inserted from previous reports / Automatically calculated
Description of the target group involvement

1

ThisdocumenthasbeengeneratedautomaticallybasedonthedatarecordeduntilDD/MM/YYYYHH:MM(CET)

4.Reporting by Work packages

WP nr. / WP title / WP start month / WP end month / WP status / WP eligible expenditure - current report / % of WP expenditure reported so far
1 / Management, publicity and communication of the PA / Pre-filled from AF / Pre-filled from AF / Drop-down list:
not started, completed, proceeding according to work plan, behind schedule, ahead of schedule / Automatically filled in from the financial section / Automatically filled in from the financial section
Partners’ involvement
Involved partners / Pre-filled from AF
Please summarise the progress in this reporting period
Please describe progress achieved in this reporting period.
Activity 1.1 / Activity title
(pre-filled from AF) / Start month
(pre-filled from AF) / End month
(pre-filled from AF) / Status
Drop-down list: not started, completed, proceeding according to work plan, behind schedule, ahead of schedule
Description of implemented activities
If applicable, please describe and justify any problems and deviations including delays from the work plan presented in the application form and the solutions found.
D 1.1.1 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
D 1.1.2 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
D 1.1.3 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
D 1.1.4 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
WP nr. / WP title / WP start month / WP end month / WP status / WP expenditure - current report / % of WP expenditure reported so far
2 / Policy development of the PA / Pre-filled from AF / Pre-filled from AF / Drop-down list:
not started, completed, proceeding according to work plan, behind schedule, ahead of schedule / Automatically filled in from Part B / Automatically filled in from Part B
Partners’ involvement
Involved partners / Pre-filled from AF
Please summarise the progress in this reporting period
Programme output indicator / Project main outputs / Project main output description / Planned delivery period / Main output quantification (target) / Achieved so far (this reporting period included) / Achieved in this reporting period / Level of achievement[1](cumulative for the entire project including current period) / Main output evidence attached to the report[2]
Pre-filled from AF / Output 2.1 / Main output 1 (Pre-filled from AF) / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated / Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned
Pre-filled from AF / Output 2.2 / Main output 2 (Pre-filled from AF) / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated / Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned
Pre-filled from AF / Output n / Main output n (Pre-filled from AF) / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated / Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned
Target groups involvement
Who will use the main outputs? / pre-filled from AF
If applicable, how did the partnership involve target groups (and other stakeholders) in the development of the project main outputs?
If applicable, how were outputs achieved in this reporting period disseminated and how are target groups making use of them?
Please describe progress achieved in this reporting period.
Activity 2.1 / Activity title
(pre-filled from AF) / Start month
(pre-filled from AF) / End month
(pre-filled from AF) / Status
Drop-down list: not started, completed, proceeding according to work plan, behind schedule, ahead of schedule
Description of implemented activities
If applicable, please describe and justify any problems and deviations including delays from the work plan presented in the application form and the solutions found.
D 2.1.1 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
D 2.1.2 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
D 2.1.3 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
D 2.1.4 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
D 2.1.5 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
WP nr. / WP title / WP start month / WP end month / WP status / WP expenditure - current report / % of WP expenditure reported so far
3 / Cooperation and coordination of the PA / Pre-filled from AF / Pre-filled from AF / Drop-down list:
not started, completed, proceeding according to work plan, behind schedule, ahead of schedule / Automatically filled in from Part B / Automatically filled in from Part B
Partners’ involvement
Involved partners / Pre-filled from AF
Please summarise the progress in this reporting period
Programme output indicator / Project main outputs / Project main output description / Planned delivery period / Main output quantification (target) / Achieved so far (this reporting period included) / Achieved in this reporting period / Level of achievement[3](cumulative for the entire project including current period) / Main output evidence attached to the report[4]
Pre-filled from AF / Output 3.1 / Main output 1 (Pre-filled from AF) / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated / Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned
Pre-filled from AF / Output 3.2 / Main output 2 (Pre-filled from AF) / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated / Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned
Pre-filled from AF / Output n / Main output n (Pre-filled from AF) / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated / Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned
Target groups involvement
Who will use the main outputs? / pre-filled from AF
If applicable, how did the partnership involve target groups (and other stakeholders) in the development of the project main outputs?
If applicable, how were outputs achieved in this reporting period disseminated and how are target groups making use of them?
Please describe progress achieved in this reporting period.
Activity 3.1 / Activity title
(pre-filled from AF) / Start month
(pre-filled from AF) / End month
(pre-filled from AF) / Status
Drop-down list: not started, completed, proceeding according to work plan, behind schedule, ahead of schedule
Description of implemented activities
If applicable, please describe and justify any problems and deviations including delays from the work plan presented in the application form and the solutions found.
D 3.1.1 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
D 3.1.2 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
D 3.1.3 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
D 3.1.4 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
D 3.1.5 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
WP nr. / WP title / WP start month / WP end month / WP status / WP expenditure - current report / % of WP expenditure reported so far
4 / EUSDR strategic projects and other projects of the PA / Pre-filled from AF / Pre-filled from AF / Drop-down list:
not started, completed, proceeding according to work plan, behind schedule, ahead of schedule / Automatically filled in from Part B / Automatically filled in from Part B
Partners’ involvement
Involved partners / Pre-filled from AF
Please summarise the progress in this reporting period
Programme output indicator / Project main outputs / Project main output description / Planned delivery period / Main output quantification (target) / Achieved so far (this reporting period included) / Achieved in this reporting period / Level of achievement[5](cumulative for the entire project including current period) / Main output evidence attached to the report[6]
Pre-filled from AF / Output 4.1 / Main output 1 (Pre-filled from AF) / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated / Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned
Pre-filled from AF / Output 4.2 / Main output 2 (Pre-filled from AF) / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated / Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned
Pre-filled from AF / Output n / Main output n (Pre-filled from AF) / Pre-filled from AF / Pre-filled from AF / Pre-filled from AF / Automatically calculated / Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned
Target groups involvement
Who will use the main outputs? / pre-filled from AF
If applicable, how did the partnership involve target groups (and other stakeholders) in the development of the project main outputs?
If applicable, how were outputs achieved in this reporting period disseminated and how are target groups making use of them?
Please describe progress achieved in this reporting period.
Activity 4.1 / Activity title
(pre-filled from AF) / Start month
(pre-filled from AF) / End month
(pre-filled from AF) / Status
Drop-down list: not started, completed, proceeding according to work plan, behind schedule, ahead of schedule
Description of implemented activities
If applicable, please describe and justify any problems and deviations including delays from the work plan presented in the application form and the solutions found.
D 4.1.1 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
D 4.1.2 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
D 4.1.3 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
D 4.1.4 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR
D 4.1.5 / Deliverable title
(pre-filled from AF) / Deliverable description
(pre-filled from AF) / Planned delivery period
(pre-filled from AF) / Progress achieved to be described / Status (Drop-down list: not started, proceeding according to work plan, behind schedule, ahead of schedule, completed and achieved as planned, completed and achieved more than planned, completed and achieved less than planned) / Deliverable evidence attached to the PR

5.Financial report

5.1 Financial Progress – Total budget of the partners(pre-filled from the monitoring system + automatically calculated)