PHAROS 9th Jan, 2007

Present:

ASTRON: J G Bij de Vaate, J Simons

UMAN: N Roddis

UBIR: -

IRA: E Natale

MECSA: P Longlhi, F Di Paolo, Natale(?)

CSIRO: R Gough

TCfA: -

Agenda:

1) Action items, see minutes of last call: http://www.radionet-eu.org/rnwiki/PHAROSWikiPage

2) ANNUAL REPORT!

3) Progress work packages

-Beamformer design

-Filter design / production

-MMIC rap-up

-Cryostat design / production

-Software-System control

4) Focal Plane Array workshop in Sydney, March 2007

5) AOB

1) Action items

Action 36: Report by Redkina is ready, should be made available on the PHAROS wiki.

Action 90: To be finished Jan 2007

Action 107/130/131: to be discussed at the Torun meeting

Acton 152: Done, to be send around

Action 153: Done, 31st – 2 Feb 2007

Action 155: Fits in 20x20x20 cm

Action 159: Weights for ASTRON antenna design details

Action 164: Done, to be send to the partners (JGBdV)

2) Annual Report

Needed for the annual report:

-manmonths personnel

-manmonths staf (AC partners)

-a summary write-up for each workpackage

-spending in euros on manpower, travel, mmics and hardware (for the 18month forcast)

Since the annual report will also functions as input for the midterm review (by EU reviewers), a more comprehensive reporting is required. Therefore more input from the workpackages is required to stengthen the write-up: deadline 19th Jan to be send to JGBdV!

(no strict size constraint but e.g. ~ 2 pages, 1 page text 1 page figures, a little input from 2004/2005 is allowed to complete the report).

For the 18 month forcast also the complete financial data is required. These are the same numbers as on the totals on the C-form.

3) Progress Work packages

-Beamformer Design

Work will restart in Feb.

-Filter design / production

Meeting scheduled in two weeks to discuss progress.

-MMIC rap-up

MECSA finished the modifications and re-test of the Mercury chips. All components of two wafers have been shipped to Manchester. A detailed report on the results is available.

The 70nm run is now scheduled to be finished by March 2007.

-Cryostat design

One Window has been ordered. Production time is about three months. Scheduled to be finished by 1st of March.

The Window will be shipped to ASTRON for RF testing (March time frame).

Approval needed to start the production of the cryostat (action ASTRON).

In order to optimize the design of the flench more details of the local mounting are required. Action for UMAN and WSRT.

-Software –System control

A meeting Torun has been scheduled for end of Jan. Jan Simons and Dave Glynn will attend the meeting.

4) Focal Plane Array Workshop

The 3rd Focal Plane Array workshop will take place in Sydney, 12th – 14th March 2007. And a PHAROS meeting is now scheduled for Friday 16th March in Sydney. All partners are invited to join the workshop as well as the meeting!!

Preliminary information on the workshop can be found at:

http://www.atnf.csiro.au/projects/ska/fpa.html

5) AOB

Next telecon 6th Feb 2007, 9.00CET

ID / Action item / Responsible / Status
36 / Noise budget calculation
-Antenna contributions
-RF chain (including IP2, IP3) / R Maaskant
Redkina/Ivashina
J Simons / Started
End 2005
Dec 2006
Systm spec
77 / F50 modeling at 20K of OMMIC transistor / D Kettle (?) / done (MI061254)
82 / Provide details of matching circuit for InP LNA / W Ciccognani / Started
85 / Measurement plan for PHAROS / M Ivashina / June 2006
86 / Prototype single element for control/calibration tests / JGBdV / p.m.
90 / Update and correct specification / J Simons / End of Dec
107 / Provide short control description / R Feiler
130 / Specify and realize FMC based on a PC104 microcontroller / E Pazderski / Done
131 / specify and realize FMC software / Torun
143 / renew power budget specification (on sub system level) / ASTRON (J. Simons) / Delayed
145 / provide antenna SMA specification to interface to cold-plate and to LNA packages inputs / ASTRON (J.Simons)
149 / Assembly schedule Beam former / Roddis / Feb 2007
150 / Position IPS / Roddis / See minutes
151b / Measure all (64) settings of phase shifter and attenuator for a couple of devices at 77K / Roddis
152 / Provide summary with IPS thermal calculations / Roddis
153 / Inquire possibility of control and calibration meeting in Torun / J Simons / Done
154 / Size external power supply / Roddis
155 / Size microcontroller / Simons / Done
158 / Report Faraday array tests at the WSRT / Ivashina / Feb 2007
159 / Height 20K plate / Roddis
161 / RF-IF connection at Parks / R Gough
162 / Details on mounting FPA on WSRT test frame / J Simons
163 / Details on mounting FPA on Lovell / N Roddis
164 / Details on mounting FPA on Parks / R Gough / Done
165 / Distribute MMIC report / E Limiti
166 / Confirm go-ahead for cryostat production / JGBdV
ID / Scheduled events / Location / Period
13 / Control Calibration meeting / Torun / 31 Jan-2 Feb
14 / FPA workshop / Sydney / 12-15 March 2007
15 / PHAROS progress meeting / Sydney / 16 March 2007

RadioNet Board Executive Telecon 4th July 2005 1