BWC/ISD/T6
Republic of the Philippines
Department of Labor and Employment
CORDILLERA ADMINISTRATIVE REGION
APPLICATION TO INSTALL ELEVATOR/MANLIFT/DUMBWAITER
1. Owner/Establishment : ______
2. Address:______
3. Owner/Manager:______
4. Building where Elevator/Manlift/Dumbwaiter is to be installed:______
______No. of stories______
5. Name and signature of person to supervise installation:______
______
(Board of Mechanical Engineering Reg. No. Licensed No.)
6. When building was erected ______installation is an addition______
addition erected, when?______
6 A. Elevator; Check whether ______Passenger or ______Freight.______
S P E C I F I C A T I O N
7. Type:______
(Traction, drum, double-belt, hydraulic, plunger)
Motive power:______
(Hand, electric, direct-connected, steam, line-shaft)
8. Height of lift _____Feet ______inches, from ______floor to ______floor______
9. Location of hoisting machine ______No. of hoistway landings______
10. Capacity ______Weight of car complete ______Speed _____ft./min.______
11. Inside dimensions of car: ______Construction of car frame:______
12. Car enclosure: Material ______No. of sides _____ height _____ Thickness______
13. Top on car ______Grilles ______Mesh ______Solid ______
Self-closing hinges section 18” in depth full width of car ______
(Yes or No)
14. Emergency exit in car: ______Location ______Size ______
Emergency switch in car: ______
15. Number of opening in car ______No. of compartments in car ______
16. Gates on car at ______sides; type ______
Height ______; contacts ______Emergency release ______
17. Distance between controller and handle on car gate ______on
Hoistway gate or door. ______
18. electric light in car ______Car gate or door tracks countersunk
19. Clearance between edge of car platform and landing sill ______
Edge of car platform and door used at landing sill ______
20. Overhead clearance: Distance of run-by of car at upper limit of travel ______
______
21. Number of hoist cables ______Material ______
Diameter ______Roping 1 to 1 ______2 to 1 ______
22. Any cables outside of hoistway ______; guarded 7’0 from floor______
23. Number of counterweight cables: Car ______Drum ______
24. Diameter of smallest sheeves: Hoisting ______; counterweight ______
Compensating ______
25. Distance between top of counterweight and overhead beams when buffers are
completely compressed ______
______
26. Pit buffers: Type ______; compression ______
Counterweight buffers: Type ______; Compression ______
27. Number of counterweight sections ______Weight of each section ______
Counterweight section and frames through-bolted ______
28. Counterweight guard: Entire travel ______; height from pit ______
Under clearance ______; compensating chains ______
29. Control: Automatic push button ______; constant-pressure push button ______
Switch ______Hand cable ______; self-centering ______
30. Current: A.C. _____ D.C. ______Reverse-phase relay to shunt type ______
______
31. Car guide rails ______Dimensions ______
(Steel or wood)
32. Counterweight guide rails ______Dimensions ______
(Steel or wood)
33. Brake: Electromechanical ______; Mechanical ______
Self-locking ______
34. Terminal limit stops ______
(on car) (in hoistway) (On machine) (On operating device)
35. Slack cable stop ______
Partition between adjacent pits ______; height ______
36. Rope lock ______type ______locking device for safety lift loads ______
37. Speed Governor: Type ______Location ______
Safety Switch: On governor ______; on safety ______
38. Car safeties: Location ______; gradual ______
(Crosshead Bottom) (Clamp)
instantaneous (Roll, Rachet, Cam) ______
39. Automatic speed retarder ______Counterweight safeties______
40. Platform under overhead sheaves and open spaces over hoistway ______
Material ______Solid ______Thickness ______
41. Skylight ______Exterior window above platform ______
Exterior window immediately below platform ______
42. Width of flooring beyond contour of machine ______handrail______
43. Distance from floor to center to bow on top of car (trap-door installation) ______
______
44. Signals ______Type ______
______
Name & Signature of Owner/Manager
______
Establishment
EVDL No. ______
Plan Fee: ______
OR No. ______
Date: ______
Date Received: ______
Received by: ______
Note:
The detailed working drawings of the elevator/manlift/dumbwaiter, the hoistway and
installation plans shall accompany this application and shall be prepared, signed and sealed by
a PROFESSIONAL MECHANICAL ENGINEER