China: HCFC Phase-out Project

Procurement Plan (P115561)

January22, 2017

I. General

1. Bank’s approvalDate of the procurement Plan [Original March 7, 2012; Revision 1: December 20, 2012; Revision 2: April 18, 2013; Revision 3: September 29, 2013; Revision 4: October 24, 2013; Revision 5: January 24, 2014; Revision 6: December 15, 2014; Revision 7: January 12, 2015; Revision 8: June 9, 2015; Revision 9: July 27, 2015; Revision 10: October 29, 2015; Revision 11: January 27, 2016; Revision 12: November 9, 2016; Revision 13: January 22, 2017]

2. Date of General Procurement Notice: August 9, 2013 (update)

3. Period covered by this procurement plan: 2012-2017

II. Goods, Works and Non-Consulting Services

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement:

Thresholds for Procurement Methods and Bank Prior Review

Expenditure Category / Contract Value (US$) / Procurement Method / Bank Prior Review
Goods / >=10 million / ICB / All contracts >= US$ 4 million
<10 million / NCB
<500k / Shopping / None
NA / DC / All DC contracts >= US$ 4 million
Works / >=40 million / ICB / All contracts >= US$ 15 million
<40 million / NCB
<500k / Shopping / None
NA / DC / All DC contracts>= US$ 15 million
Notes: / ICB – International Competitive Bidding
NCB – National Competitive Bidding
DC – Direct Contracting
NA – Not Applicable

2. Prequalification.Bidders for ______shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines: Not applicable.

3. Proposed Procedures for CDD Components (as per paragraph. 3.19 of the Guidelines: Not applicable.

4. Reference to (if any) Project Implementation Manual (PIM): The National Implementing Agency (FECO) has prepared a project implementation manual including a procurement management manual for the project, which has been reviewed by the Bank.

5. Any Other Special Procurement Arrangements: (i) Retroactive financing and advance contracting may be used under this project. The proposed retroactive financing is subject to the payments being made within 12 months of the signing date of the legal agreement.; (ii) Goods, works and non-consulting services under Components 1 will be procured by the beneficiary enterprises and follow the Bank procurement guidelines. The activities to be procured by the beneficiary enterprises shall be also packaged by contracts in this procurement plan and be approved by the Bank.

6. Procurement Packages with Methods and Time Schedule

1

Goods, Works and Non-consulting Services under Components 1

Procured by Beneficiary Enterprises

1 / 2 / 3 / 4 / 5 / 6 / 7 / 8 / 9 / 10 / 11 / 12
Ref. No. / Name of company / Contract
(Description) / Date of Contract Signing / Estimated
Cost (US Dollars) / Procurement
Method / Prequalification (yes/no) / Domestic Preference
(yes/no) / Review
by Bank
(Prior / Post) / Expected
Bid-Opening
Date / Actual Contract Value / Contract Duration
PU-1 / Qingdao CIMC Reefer Container Manufacture Co., Ltd. / Storage system and tanks / 27 February 2014 / 119,672 / Shopping / no / no / Post / December 2013 / ¥730,000
$119,672 / 12 months
PU-2 / Pre-mix system / February 2014 / 609,934 / Shopping / no / no / Post / January 2014 / ¥3,720,600
$609,934 / 12 months
PU-3 / High pressure foam machines (14 units) / 16 April 2014 / 3,645,659 / ICB / no / no / Prior / March 2014 / $3,645,659 / 12 months
PU-4 / Safety system / 16 June 2014 / 400,000 / Shopping / no / no / Post / May 2014 / ¥2,432,000
$398,688 / 6 months
PU-5 / Qingdao CIMC Special Reefer Co., Ltd. / Storage system and tanks / 27 February 2014 / 119,672 / Shopping / no / no / Post / December 2013 / ¥730,000
$119,672 / 6 months
PU-6 / Pre-mix system / February 2014 / 609,934 / Shopping / no / no / Post / January 2014 / ¥3,720,600
$609,934 / 6 months
PU-7 / High pressure foam machines (14 units) / 16 April 2014 / 1,414,566 / ICB / no / no / Prior / March 2014 / $1,414,566 / 6 months
PU-8 / Safety system and Nitrogen equipment / 16 June 2014 / 386,230 / Shopping / no / no / Post / May 2014 / ¥2,356,000
$386,230 / 6 months
PU-9 / Guangdong Xingxing Refrigeration Equipment Co., Ltd / Two High pressure foam machines (H22-100) / 30 December 2013 / 241,000 / Shopping / no / no / Post / November 2013 / ¥2,260,000
$370,492 / 9 months
PU-10 / Three high pressure foam machines (2 units of H11-100 and a H1-40) / 25 March 2014 / 291,478 / Shopping / no / no / Post / December 2013 / ¥1,790,000
$293,442 / 9 months
PU-11 / Pre-mix system / 6 March 2014 / 85,830 / Shopping / no / no / Post / December 2013 / ¥520,000
$85,246 / 9 months
PU-12 / Storage system and tanks / 25 December 2013 / 138,300 / Shopping / no / no / Post / November 2013 / ¥858,000
$140,656 / 9 months
PU-13 / Safety and ventilation system / 13 March 2014 / 65,000 / Shopping / no / no / Post / December 2013 / ¥426,600
$69,836 / 9 months
PU-14 / Guangzhou Suiling Electrical Co., Ltd / Three high pressure foam machines / May 27th 2013 / 382,800 / Shopping / no / no / Post / May 6th 2013 / ¥2,430,000
$398,361 / 6 months
PU-15 / Storage system and tanks / June 6th 2013 / 87,100 / Shopping / no / no / Post / May 6th2013 / ¥550,000
$90,164 / 6 months
PU-16 / Safety and ventilation system / June 6th 2013 / 329,153 / Shopping / no / no / Post / May 6th 2013 / ¥1,970,000
$322,951 / 6 months
PU-17 / Retrofit three existing foam machines / May 27th 2013 / 79,000 / Shopping / no / no / Post / May 6th 2013 / ¥505,000
$82,787 / 6 months
PU-18 / Jiangsu Gelin Electric Co. Ltd., / Two Hp-100 high pressure foam machines / Aug 18th 2013 / 376500 / Shopping / no / no / Post / August2013 / ¥2,250,000
$368,852 / 10 months
PU-19 / Five high pressure foam machines ( 4 units of KL-100H and a KL-40H) / Sep 30th 2013 / 380500 / Shopping / no / no / Post / September2013 / ¥2,420,000
$396,721 / 10 months
PU-20 / Safety, storage and ventilation system / Aug 31st 2013 / 110000 / Shopping / no / no / Post / August 2013 / ¥820,000
$134,426 / 9 months
PU-21 / Hangzhou Kaili Stainless Steel Kitchen Equipment Co., Ltd / Procure 2 units of H100 and a H180 foam machines and retrofit a H100C foam machines / July 16th 2013 / 346500 / Shopping / no / no / Post / July 5th
2013 / ¥2,150,000
$352,459 / 9 months
PU-22 / Storage system and tanks / 10 January 2014 / 71500 / Shopping / no / no / Post / January 2014 / ¥457,600
$75,016 / 9 months
PU-23 / Safety and ventilation system / 17 April 2014 / 100450 / Shopping / no / no / Post / April 2014 / ¥658,000
$107,869 / 9 months
PU-24 / Shandong Hongtai Electrical Appliance Co.,Ltd / Procure three high pressure foam machines and retrofit two foam machines / June 16th 2013 / 382,000 / Shopping / no / no / Post / June 4th
2013 / ¥2,350,000
$385,246 / 6 months
PU-25 / Pre-mix, safety, ventilation and Storage systems / June 16th 2013 / 305,000 / Shopping / no / no / Post / June 4th 2013 / ¥1,980,000
$324,590 / 6 months
PU-26 / Retrofit the foam production lines and foam moulds / July 8th 2013 / 220,000 / Shopping / no / no / Post / June 18th
2013 / ¥1,310,000
$214,754 / 6 months
PU-27 / Zhejiang Debao Electrical Appliance Co.,Ltd / A HP100 foam machine / April 28th
2013 / 120,000 / Shopping / no / no / Post / March 26th
2013 / ¥755,000
$123,770 / 5 months
PU-28 / Retrofit 4 foam machines and procure a storagesystem / Aug 3rd 2013 / 163,000 / Shopping / no / no / Post / July 8th 2013 / ¥1,028,000
$168,525 / 10 months
PU-29 / Retrofit production lines and procure safety, and ventilation systems / 9 January 2014 / 181,858 / Shopping / no / no / Post / 18 November 2013 / ¥1,253,000
$205,410 / 10 months
PU-30 / Zhejiang Huamei Manufacture Electric Appliances Co.,Ltd / Three high pressure foam machines ( a HP150 and 2 units of HP40) / July 10th 2013 / 326,000 / Shopping / no / no / Post / May 23th2013 / ¥2,021,200
$331,344 / 8 months
PU-31 / Three high pressure foam machines ( HP100) / Aug 17th 2013 / 362,000 / Shopping / no / no / Post / July 30th
2013 / ¥2,253,000
$369,344 / 6 months
PU-32 / Retrofit 4 foam machines and procure supply system / July 10th 2013 / 226,300 / Shopping / no / no / Post / May 23th 2013 / ¥1,407,000
$230,656 / 10 months
PU-33 / Shanghai CIMC Reefer Containers Manufacture Co., Ltd.
and
Taicang CIMC reefer logistics equipment Co., Ltd. / Pre-mix system / 28 February 2014 / 360,000 / Shopping / no / no / Post / January 2014 / ¥3,180,000
$521,311 / 12 months
PU-34 / ventilation system / 10 December
2014 / 190,000 / Shopping / no / no / Post / August 2014 / ¥1,845,000
$302,459 / 12 months
PU-35 / High pressure foam machines (11 units) / 16 April 2014 / 3,670,000 / ICB / no / no / Prior / March 2014 / $2,834,375 / 12 months
PU-36 / Safety system / 25 July 2014 / 320,000 / Shopping / no / no / Post / May 2014 / ¥2,168,000
$355,410 / 12 months
PU-43 / Yindu Kitchen Equipment Co.,Ltd / High pressure foam machines (2 units) / 25 November 2013 / 227,900 / Shopping / no / no / Post / August 2013 / ¥1,398,100
$229,197 / 12 months
PU-44 / Retrofitting 4 foam machines / 25 November 2013 / 254,000 / Shopping / no / no / Post / August 2013 / ¥1,558,200
$255,443 / 12 months
PU-45 / Safety, ventilation and nitrogen system and supply system / 9June 2014 / 363,300 / Shopping / no / no / Post / 30 May
2014 / ¥2,222,671
$356,426 / 12 months
PU-46 / Retrofitting production lines / 29December 2013 / 113,200 / Shopping / no / no / Post / May
2013 / ¥692,557.6
$113,534 / 12 months
PU-47 / Zhejiang Iceshare Refrigeration Appliance Co., Ltd / High pressure foam machines (3 units) / 21 January 2014 / 244,780 / Shopping / no / no / Post / October 2013 / ¥1,740,000
$285,246 / 9 months
PU-48 / Raw material supply system / 21 January 2014 / 72,600 / Shopping / no / no / Post / October 2013 / ¥390,000
$63,934 / 9 months
PU-49 / Retrofit the foam moulds / 27 February 2014 / 20,000 / Shopping / no / no / Post / December 2013 / ¥245,000
$40,164 / 7 months
PU-50 / Safety and ventilation system / 6 February 2014 / 100,000 / Shopping / no / no / Post / October 2013 / ¥520,000
$85,246 / 7 months
PU-51 / Jiaxing Zhongyi Electric Appliance Co., Ltd. / CP based foam machines (2 units) / 13 June 2014 / 350,000 / Shopping / no / no / Post / August 2013 / $349,700 / 8 months
PU-52 / Retrofitting foam machine (ED02-05) / 13 June 2014 / 65,000 / Shopping / no / no / Post / September
2013 / $64,900 / 8 months
PU-53 / Storage and feeding system for MDI and CP based polyol / 10 June 2014 / 50,000 / Shopping / no / no / Post / April 2014 / ¥380,000
$62,295 / 8 months
PU-54 / Safety and ventilation system / 10 June 2014 / 253,258 / Shopping / no / no / Post / April 2014 / ¥1,450,000
$237,705 / 8 months
PU-55 / Storage tank, nitrogensystem, pipes and other modifications / 10 June 2014 / 66,400 / Shopping / no / no / Post / April 2014 / ¥359,000
$58,852 / 8 months
PU-56 / Zhejiang Hailishi Electrical Appliance Co., Ltd / CP based foam machines (2 units) / 13 June 2014 / 350,000 / Shopping / no / no / Post / August 2013 / $348,500 / 8 months
PU-57 / Storage and feeding system for MDI and CP based Polyol / 10 June 2014 / 45,000 / Shopping / no / no / Post / April 2014 / ¥360,000
$59,106 / 8 months
PU-58 / Safety and ventilation system / 10 June 2014 / 239,160 / Shopping / no / no / Post / April 2014 / ¥1,160,000
$190,164 / 8 months
PU-59 / Hangzhou Chuangxin Refrigeration Electric Appliances Co., Ltd. / CP based foam machines (2 units) / Aug 25th 2013 / 200,000 / Shopping / no / no / Post / July 2013 / ¥1,187,000
$154,590 / 10 months
PU-60 / Raw material supply system / 30 April
2014 / 41,000 / Shopping / no / no / Post / June
2013 / ¥300,000
$49,180 / 10 months
PU-61 / Ventilation system and retrofitting production lines and heating system / 1 December
2013 / 146,172 / Shopping / no / no / Post / July 2013 / ¥890,000
$145,902 / 12 months
PU-62 / Safety system / 30 April
2014 / 35,000 / Shopping / no / no / Post / June
2013 / ¥200,000
$32,787 / 10 months
PU-63 / Guangzhou Chengyun Kitchen Refrigeration Equipments Co.,Ltd / CP based foam machines (2 units) and safety system / 20 July
2014 / 222,490 / Shopping / no / no / Post / June
2013 / ¥1,380,000
$226,230 / 5 months
PU-64 / Yangzhou Tonglee Reefer Container Co., Ltd / CP based foam machines (HP-2500) / 11 September 2014 / 290,000 / Shopping / no / no / Post / May
2013 / $246,500 / 6 months
PU-65 / CP based foam machines (HP-650) / 17 October 2014 / 96,000 / Shopping / no / no / Post / May
2013 / ¥550,000
$90,164 / 6 months
PU-130 / Cyclopentane tank / 20 October 2014 / 328,600 / Shopping / no / no / Post / June 2014 / ¥910,000
$149,180 / 2 months
PU-66 / Jiangsu Qiaoyi Kitchen Equipment Co., Ltd / CP based foam machines (2 units of H100 and 2 units of H40) / 11 November 2014 / 370,000 / Shopping / no / no / Post / September 2013 / ¥2,380,000
$390,164 / 9 months
PU-67 / Zhejiang Kangquan Electrical Appliance Co., Ltd / CP based foam machine (H40) and Storage and feeding system,and safety and ventilation system / 18 February 2014 / 210,720 / Shopping / no / no / Post / November 2013 / Euro163,500
$22,840.95 / 9 months
PU-69 / Sidelong International Electrical (China) Co.,Ltd / Retrofitting foam machine (H100) and Safety and ventilation system / 2 March 2014 / 86,675 / Shopping / no / no / Post / May
2013 / ¥490,000
$80,328 / 6 months
PU-70 / Solareast Solar Energy Co., Ltd / Procurement of foam machines for plant one (H100 2 sets and H40 2 sets) / 31 October 2014 / 383,500 / Shopping / no / no / Post / March 2014 / ¥2,346,800
$384,721 / 12 months
PU-71 / Procurement of foam machines for plant two ( H40 4 sets) / 31 October 2014 / 373,000 / Shopping / no / no / Post / October 2014 / ¥2,264,800
$371,278 / 12 months
PU-72 / Storage tank for polyol and MDI ( 35 M3 polyol tank, 2 sets, 35 M3 MDI tank, 1 set) / 3 December 2014 / 209,000 / Shopping / no / no / Post / October 2014 / ¥1,320,000
$216,393 / 12 months
PU-73 / Retrofit existing foam machines ( H100, 3 sets) / 31 October 2014 / 181,500 / Shopping / no / no / Post / March 2014 / ¥1,086,600
$178,131 / 12 months
PU-74 / Procurement of pre-mixing system ( capacity 40L/min, 2 sets) the transfer pipes, 5000 meters / 16 December 2014 / 368,000 / Shopping / no / no / Post / 25 October 2014 / ¥2,360,000
$384,790 / 12 months
PU-75 / 35 M3 Storage tank for CP, 2 sets; storage and transfer system of polyol and ISO, 2 sets / 3 December 2014 / 399,000 / Shopping / no / no / Post / 18 October 2014 / ¥2,180,000
$355,442 / 12 months
PU-76 / Safety and ventilation system, and equipment modification / 16 December 2014 / 396,000 / Shopping / no / no / Post / 18 October 2014 / ¥2,430,000
$396,204 / 12 months
PU-77 / Wuhu Midea Kitchen & Bathroom Electric Appliances Manufacturing Co., Ltd. / CP storage tank and ventilation system, and nitrogen and power system / 16 June 2014 / 390000 / Shopping / no / no / Post / February 2014 / ¥1,795,000
$294,262 / 4 months
PU-78 / Pre-mix machines (40kg/min) and safety system / 16 June 2014 / 350000 / Shopping / no / no / Post / November,2013 / ¥210,000
$34,426 / 7 months
PU-79 / Retrofit the existing foam machines (ECOPLUS H100 4 sets, GMA-H100 2 sets) / December 2013 / 310000 / Shopping / no / no / Post / December 2013 / ¥1,889,000
$309,672 / 4 months
PU-80 / Fire-fighting system / 21 July 2014 / 80000 / Shopping / no / no / Post / February 2014 / ¥89,500
$14,672 / 3 months
PU-81 / Retrofit the mould of 340mm diameter / 12 June 2014 / 250000 / Shopping / no / no / Post / June 2014 / ¥1,252,000
$205,246 / 7 months
PU-82 / Shandong Linuo-Ritter Solar Energy Co., Ltd. / 35 M3 CP storage tank and transfer system / 14 April 2014 / 162,800 / Shopping / no / no / Post / 20 January 2015 / ¥614,700
$99,184 / 15 months
PU-83 / Pre-mixing system (≥36 kg/min) and retrofit the foam machines ( H100 2sets, H40 1 set) / 11 November 2014 / 266,800 / Shopping / no / no / Post / 24 October 2014 / ¥1,790,000
$293,501 / 15 months
PU-84 / Retrofit the foam production lines ( 3 lines) / 2 June 2015 / 133,500 / Shopping / no / no / Post / 18 May 2015 / ¥1,080,000
$177,049 / 15 months
PU-85 / Safety system / 28 June 2015 / 125,900 / Shopping / no / no / Post / 29 May 2015 / ¥1,076,000
$176,393 / 15 months
PU-86 / Changzhou JingXue Refrigeration Equipment Co., Ltd. / Procurement of High pressure machines (H100 1 set, H10 1 set) / 6 July 2015 / 195000 / Shopping / no / no / Post / 12 June 2015 / ¥1,220,000
$200,000 / 9 months
PU-87 / Procurement of High pressure machines (H200 2 sets) / 11 April 2015 / 330000 / Shopping / no / no / Post / 2 April 2015 / Euro300,000 / 9 months
PU-88 / Safety system / 10 August
2015 / 280000 / Shopping / no / no / Post / August 2015 / ¥1,856,287
$304,309 / 9 months
PU-89 / Retrofit the foam machines for continuous panel (H40 1 set and H100 1 set) / 21 August
2015 / 275000 / Shopping / no / no / Post / August 2015 / ¥1,803,700
$295,688 / 9 months
PU-90 / Retrofit the foam machines for panel(H100 2 sets) / 20 July 2015 / 250000 / Shopping / no / no / Post / 7 July 2015 / ¥1,587,000
$260,164 / 9 months
PU-91 / Pre-mixing system (80L/min) and 35 M3 CP storage tank / 10 June 2015 / 280000 / Shopping / no / no / Post / 31 April 2015 / ¥1,756,000
$287,869 / 9 months
PU-92 / Shenyang Guosheng Anticorrosion & Thermal Insulation Co., Ltd. / Procurement of foam machines (H100 1 set, H200 1 set, H300 1 set)and safety system / 22 Jan.
2016 / 810,350 / ICB / no / no / Prior / October, 2015 / $526,000 / 9 months
PU-93 / Fire-fighting system, power and nitrogen system, and ventilation system / 5 August
2015 / 171,150 / Shopping / no / no / Post / 13 February 2015 / ¥1,315,166.93
$215,601 / 9 months
PU-159 / Procurement of foam machines (H40 2 sets) / 10 May
2016 / 158,728.78 / Shopping / no / no / Post / March, 2016 / ¥1,180,000
$193,443 / 9 months
PU-94 / Liaocheng Sanli Insulation Materials Co., Ltd. / Procurement of foam machines ( H160 2 sets, H80 1 set, and H20 1 set) / 20
August
2015 / 880,000 / ICB / no / no / Prior / 12 April 2015 / $517,620 / 9 months
PU-95 / Storage system for Polyol and ISO / 11 September 2014 / 50,000 / Shopping / no / no / Post / 5September 2014 / ¥310,000
$50,978 / 9 months
PU-96 / Safety system / 11 September 2014 / 150,000 / Shopping / no / no / Post / 5September 2014 / ¥1,100,000
$180,888 / 9 months
PU-158 / Mold renovation / 24
October
2015 / 40,000 / Shopping / no / no / Post / 12 October
2015 / ¥307,802
$50459 / 12 months
PU-97 / Duowei Joint Light Steel Panel ( Group) Co. , Ltd. / Retrofit of the high pressure foam machine / 29 June
2016 / 392000 / Shopping / no / no / Post / May 2016 / $363,420 / 10 months
PU-98 / CP storage system, ventilation system, and safety alarm system / 26 August 2016 / 254500 / Shopping / no / no / Post / December 2016 / ¥1,969,800
$322,918 / 9 months
PU-99 / Retrofit of polyol storage system and other systems of foam machine / 30 September 2016 / 118500 / Shopping / no / no / Post / December 2016 / ¥1,190,000
$195,082 / 7 months
PU-100 / Modification of safety system / 7 December 2016 / 139000 / Shopping / no / no / Post / December 2016 / ¥752,000
$123,279 / 4 months
PU-101 / Modification of heating system / 10 October 2016 / 110000 / Shopping / no / no / Post / December 2016 / ¥553,400
$90,721 / 7 months
PU-102 / YantaiTonghua Waterproof & Thermal Insulation Engineering Co., Ltd. / Procurement of foam machines ( 4 sets of H40) / 25 Jan.
2016 / 678000 / ICB / no / no / Prior / October 2015 / $517,000 / 10 months
PU-103 / Procurement of CP storage system / 2 March
2015 / 90000 / Shopping / no / no / Post / February 2015 / ¥498000
$81,894 / 10 months
PU-104 / Retrofit of foam production lines ( heating system of 5 production lines) / 70160 / Shopping / no / no / Post / Febuary
2017 / 10 months
PU-105 / Procurement of pre-mixing system (1set of 80Kg/min) / 200000 / Shopping / no / no / Post / Febuary
2017 / 10 months
PU-106 / Retrofit of foam machines (1 set of H40) / 40000 / Shopping / no / no / Post / Febuary
2017 / 10 months
PU-107 / Procurement of safety system / 345000 / Shopping / no / no / Post / Febuary
2017 / 10 months
PU-108 / Lvyuan New Material Co., Ltd. / Procurement of CP and polyol storage system / 9 December 2016 / 140000 / Shopping / no / no / Post / December 2016 / ¥1,497,130
$245,431 / 6 months
PU-109 / Procurement of foam machine (2 sets of H300 and 2 sets of H40) / 22 April
2016 / 1,449,984 / ICB / no / no / Prior / September 2015 / $1,250,024 / 6 months
PU-111 / Safety system / 9 December 2016 / 191,000 / Shopping / no / no / Post / December 2016 / ¥1,776,800
$291,279 / 6 months
PU-112 / Langfang Huayu Innovation Technology Co., Ltd. / CP storage system / 8 July 2015 / 99000 / Shopping / no / no / Post / 12 May 2015 / ¥516,000
$84,590 / 6 months
PU-113 / Procurement of foam machine (1 set of H140 with two systems) / 24 December 2015 / 810000 / ICB / no / no / Prior / October 2015 / ¥3,630,000
$595,082 / 9 months
PU-114 / Safety system / 8 July 2015 / 187000 / Shopping / no / no / Post / 12 May 2015 / ¥1,211,000
$198,525 / 6 months
PU-115 / Foshan Shunde Chencun Zhongbao kitchen equipment plant / Procurement of foam machine ( 1 set of H100) / 3 July 2014 / 143754 / Shopping / no / no / Post / 10 June 2014 / ¥910,000
$149,180 / 12 months
PU-116 / Retrofit of foam machines ( 2 sets of H100) / 3 July 2014 / 99889 / Shopping / no / no / Post / 10 June 2014 / ¥630,000
$103,279 / 12 months
PU-117 / Polyol storage tank / 2 July 2014 / 21000 / Shopping / no / no / Post / 10 June 2014 / ¥145200
$28,302 / 12 months
PU-118 / Safety system / 2 July 2014 / 66557 / Shopping / no / no / Post / 10 June 2014 / ¥431,470
$70,733 / 12 months
PU-119 / Binzhou Tianhong Electric Appliance Co. , Ltd / Procurement of foam machines ( 2 sets of H100) / 22 July 2014 / 330600 / Shopping / no / no / Post / 25 June 2014 / ¥2,090,000
$342,623 / 12 months
PU-120 / Retrofit of foam machines ( 1 set of H40, 2 sets of H100) / 22 July 2014 / 144000 / Shopping / no / no / Post / 25 June 2014 / ¥910,000
$149,180 / 12 months
PU-121 / Safety system / 22 July 2014 / 95000 / Shopping / no / no / Post / 25 June 2014 / ¥600,000
$98,361 / 9 months
PU-122 / Ningbo Shuaikang water heaters Co., Ltd. / Polyol storage system / 21 October
2014 / 41500 / Shopping / no / no / Post / 19 April 2014 / ¥254,000
$41639 / 8 months
PU-123 / Procurement of foam machine ( 1 set of H40) / 21 October
2014 / 129400 / Shopping / no / no / Post / 19 April 2014 / $130,728 / 9 months
PU-124 / Safety system / 21 October
2014 / 124200 / Shopping / no / no / Post / 19 April 2014 / $122,293 / 9months
PU-125 / Shandong Sang LeSolar Energy Co., Ltd. / Retrofit of foam machines ( 5 sets of H100) / 30 August
2016 / 575000 / NCB / no / no / Prior / March 2016 / ¥3,750,000
$614754 / 8 months
PU-126 / Retrofit of foam production lines ( 3 production lines) / 78000 / Shopping / no / no / Post / Febuary
2017 / 6 months
PU-127 / CP and polyol storage system / 50000 / Shopping / no / no / Post / Febuary
2017 / 6months
PU-128 / Safety system / 216000 / Shopping / no / no / Post / Febuary
2017 / 6 months
PU-129 / Jiaxing Comely Electric Appliance Co., Ltd. / Procurement of foam machine ( 1 set of H100), retrofit of foam machine ( 1 set of H100), supply system and safety system / 1 September
2014 / 286475 / Shopping / no / no / Post / 18 March 2014 / ¥1,538,700
$252,246 / 10 months
PU-131 / Shandong INOV New Material Co., Ltd. / Static mixer / 9 October
2015 / 49,180
¥300,000 / Shopping / no / no / Post / September 2015 / ¥488,000
$80000 / 2 months
PU-132 / CP storage tank and transfer system / 9 October
2015 / 81,967
¥500,000 / Shopping / no / no / Post / October 2015 / ¥479880
$78,669 / 3 months
PU-133 / Polyol pre-mix and mix system / 9 October
2015 / 113,115
¥690,000 / Shopping / no / no / Post / October 2015 / ¥680,000
$111,475 / 2 months
PU-134 / Testing equipment / 18 August 2016 / 59,016
¥360,000 / Shopping / no / no / Post / December 2016 / ¥298,400
$48,918 / 3 months
PU-135 / Shandong Lecron Energy-Saving New Material Co., Ltd. / CP storage tank and stainless steel mixer / 245,902
¥1,500,000 / Shopping / no / no / Post / Febuary
2017 / 6 months
PU-136 / Automatic filling machine / 68,852
¥420,000 / Shopping / no / no / Post / Febuary
2017 / 1 month
PU-137 / Safety systems / 37,705
¥230,000 / Shopping / no / no / Post / Febuary
2017 / 6 months
PU-138 / Shaoxing Hengfeng Polyurethane Industry Co., Ltd. / CP and polyol storage and mixer / 27 November
2015 / 340,328
¥2,076,000 / Shopping / no / no / Post / September 2015 / ¥2100000
$344,262 / 6 months
PU-139 / Semi-auto filling machine / 28 November
2015 / 47,213
¥288,000 / Shopping / no / no / Post / September 2015 / ¥300000
$49,180 / 6 months
PU-140 / Safety systems / 24 November
2015 / 39,344
¥240,000 / Shopping / no / no / Post / September 2015 / ¥300000
$49,180 / 6 months
PU-141 / Shanghai Dongda Polyurethane Co., Ltd. / Automatic filling system / 24,590
¥150,000 / Shopping / no / no / Post / Suspended / 3 months
PU-142 / Pre-mix system / 24,590
¥150,000 / Shopping / no / no / Post / Suspended / 5 months
PU-143 / Storage and mixer / 132,787
¥810,000 / Shopping / no / no / Post / Suspended / 4 months
PU-144 / Instruments and alarm system / 45,902
¥280,000 / Shopping / no / no / Post / Suspended / 4 months
PU-145 / Zhengzhou Guangyang Industries Co., Ltd. / Automatic filling machine / 40,984
¥250,000 / Shopping / no / no / Post / Febuary
2017 / 5 months
PU-146 / CP storage tank and pre-mix system / 198,361
¥1,210,000 / Shopping / no / no / Post / Febuary
2017 / 5 months
PU-147 / Nitrogen, testing and safety systems / 106,557
¥650,000 / Shopping / no / no / Post / Febuary
2017 / 5 months
PU-148 / Guangzhou Langtang Polyurethane Co., Ltd. / CP storage tank and pre-mix system / 160,328
¥978,000 / Shopping / no / no / Post / Febuary
2017 / 6 months
PU-149 / Foam machine and automatic filling machine / 111,803
¥682,000 / Shopping / no / no / Post / Febuary
2017 / 3 months
PU-150 / Safety system / 35,377
¥215,800 / Shopping / no / no / Post / Febuary
2017 / 9 months
PU-151 / Guangdong Weber Electrical Appliances Co., Ltd. / H40 foam machines (single head, 3 units) / 368,600 / Shopping / no / no / Post / Febuary
2017 / 4 months
PU-152 / H40 foam machines (dual head, 2 units) / 300,600 / Shopping / no / no / Post / Febuary
2017 / 4 months
PU-153 / High pressure foam machine retrofit / 125,000 / Shopping / no / no / Post / Febuary
2017 / 5 months
PU-154 / CP polyol storage and transfer system and safety system / 253,051 / Shopping / no / no / Post / Febuary
2017 / 5 months
PU-155 / Guangzhou Zhuocheng Weiye Electrical Appliances Co., Ltd. / Foam machines / 28 May 2015 / 394,000 / Shopping / no / no / Post / 25 March 2015 / ¥2,410,000
$395,082 / 18 months
PU-156 / CP polyol storage and transfer system / 3 June 2015 / 96,948 / Shopping / no / no / Post / 25 March 2015 / ¥609,000
$99,836 / 18 months
PU-157 / Safety systems / 3 June 2015 / 128,000 / Shopping / no / no / Post / 25 March 2015 / ¥831,020
$136,233 / 18 months
PU-158 / FECO / Blowing Agent Detectors (11 sets) / 330,000 / NCB / no / no / Post / March 2017 / 18 months
PU-159 / FECO / Journal Publication / 153,000 / Shopping / no / no / Post / Febuary 2017 / 12 months
PU-160 / FECO / Field Tests of PU Foam Products with Alternative Technologies / 300,000 / Shopping / no / no / Post / May 2017 / 12 months
Total / 42,237,310

1

III. Selection of Consultants

1. Prior Review Threshold and Selection Method: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Thresholds for Selection Methods and Bank Prior Review

Expenditure Category / Contract Value (US$) / Procurement Method / Bank Prior Review
Consultant Services / >=300k / QCBS, QBS / Firms: All contracts ≥ US$2 million;
Firms: All SSS contracts >= US$ 1 million;
Individual Consultant: >= US$ 400,000;
SSS for individual consultant: ≥ US$400,000
<300k / QCBS, QBS, CQS
NA / SSS
NA / IC
Other / All terms of reference for consultant contracts, regardless of contract value, will be subject to Bank prior review
Notes: / QCBS – Quality- and Cost-Based Selection
QBS – Quality-Based Selection
CQS – Selection Based on the Consultants’ Qualifications
SSS – Single (or Sole) -Source Selection
IC – Individual Consultant selection procedure
NA – Not Applicable

2. Short list comprising entirely of national consultants:Short list of consultants for services, estimated to cost less than US$500,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

3. Any Other Special Selection Arrangements: NA.

4. Consultancy Assignments with Selection Methods and Time Schedule

4.1 HCFC production sector

Ref. No. / Description of Assignment / Estimated
Cost (US Dollars) / Selection
Method / TOR preparation/
clearance / Review (prior/post) / Expected
Proposals Submission
Date / Comments
Pro.-CS-1 / MIS: To develop a system for trackingHCFCs phase-out and implementation of annual Work Programs and other related project activities / 200,000 / QBS / 2015-12 / Post / 2017-12 / On-going
Pro.-CS-2 / Monitoring and supervision on safeguard management: To hire individual consultant or consulting firm to provide technical supports in overseeing and monitoring safeguards management in the project that the production facilities close-down or relocation, including but not limited to: provide day-to-day consultation to the enterprise, help the enterprise to prepare the RAP and/or DDR until it is satisfactory to the World Bank, and supervise the implementation of the plans. / 100,000 / IC / 2016-6 / Post / 2017-3 / The contract was signed in July., 2016, and the amount is US$ 100,000, and on-going
Pro.-CS-3 / Annual Financial Audit (FY 2014): To conduct the annual financial audit by CANO to verify whether the funding received are allocated and disbursed as per the requirement of the Bank. / SSS / 2015-5 / Completed,
funded by Chinese government
Pro.-CS-4 / Technical Support for verification and monitoring: to hire individual consultants to provide the technical comments, technical appraisal and necessary assistance to the PMO during the verification and monitoring, as well as the day-to-day project management and implementation. / 50,000 / IC / 2017-2 / Post / 2017-12
Pro.-CS-5 / Research and study on HCFC alternatives: to conduct a socio, economic and technicalinvestigation and assessment on the alternatives for HCFC technology, so as to provide the advices and suggestions on standard development and modification, industry development, etc. / 122,900 / CQS / 2016-9 / Post / 2017-12 / On bidding process
Pro.-CS-6 / Investigation on 2013 Feedstock Applications of HCFCs: to understand on the current situation of the HCFC used as feedstock in China, and analysis the development trend of the feedstock use of HCFC, as well as put forward suggestions to strengthen management of HCFCs feedstock use. / 96,023 / QCBS / 2013-11 / Post / 2014-10 / The contract was signed in Nov., 2013, and the amount is US$ 96,023, and completed
Pro.-CS-7 / Research and Study on Conversion Technology of HFC-23:to provide co-financing support on research and development on HFC-23 conversion technology to try to find a more cost effective and applicable solution on HFC-23 disposal so to minimize associated climate impact. / 350,000 / QBS / 2016-7 / Post / 2017-12
Pro.-CS-8 / Investigation on Feedstock Applications of HCFCs in 2014 and 2015: to stringent control of HCFC use in feedstock will prevent illegal production and use of HCFCs / 98,153 / CQS / 2015-8 / Post / 2016-3 / The contract was signed in Aug., 2015, the amount is US$98,153, and the draft completion report had been submitted
Pro.-CS-9 / Investigation on reducing HFC-23 by-product ratio in the best practice:to formulate technical Suggestions of reducing HFC-23 by-product ratio on the best practise / 99,900 / CQS / 2015-10 / Post / 2016-5 / On bidding process
Pro.-CS-10 / HCFC Phase-out stage II in China HCFC production Sector and
PU Foam Sector Environmental and Social Safeguard Framework: to revise an Environmental and Social Safeguards Framework (ESSF) for stage II / 80,000 / IC / 2016-11 / Post / 2017-5
Pro.-CS-11 / Annual Financial Audit (FY 2015): To conduct the annual financial audit by CANO to verify whether the funding received are allocated and disbursed as per the requirement of the Bank. / SSS / 2016-5 / Completed,
funded by Chinese government
Pro.-CS-12 / Annual Financial Audit (FY 2016): To conduct the annual financial audit by CANO to verify whether the funding received are allocated and disbursed as per the requirement of the Bank. / SSS / 2017-5 / Funded by Chinese government
Total / 896,976

4.2 PU foam sector