  1. Introduction and subject of the contract
    The contracting authority is the European External Action Service (herein after referred to as the "EEAS"), represented by the Head of Delegation of the European Union to the Republic of South Africa, located in Pretoria or its duly authorised representative.

The EEAS plans to conclude a framework contract for the supply of UPS'sto the Delegation of the European Union to South Africa.

The tender procedure will be concluded with the signing of a framework contract, the framework contract will be implemented through order forms. The order form creates a direct obligation on the contracting authority at the time of its signature.

When drawing up their tenders, tenderers shall take into account the provisions in the tender specifications; in the letter of invitation to tender as well as in the framework contract, which specify the rights and obligations of the contractor, particularly those on payments, performance of the contract, confidentiality, checks and audits.

The model framework contract that will be used for this contract is attached to the letter of invitation as Annex 2. These tender specifications and the tender submitted by the awardee of the contract will be annexed to the contract and therefore be binding on the contracting parties during implementation of the contract.

  1. Place of delivery

The supplies will have to be delivered to the premises of the EU Delegation, Building 1, 27 George Storrar Drive, Groenkloof.

All contracted supplies are to be provided in a flexible manner according to the Delegation's requirements. This means that during the duration of the contract the list of supplies and the quantities may increase or decrease

  1. Technical specifications and standards

Supply of UPS's

No. / Features / Specifications
1. / Output Voltage : / Minimum AC 220V – Maximum AC 230V
2. / Power Capacity / Minimum 600 Watt - maximum 1100 VA
3. / Surge Suppression / Yes
4. / Surge Energy Rating / 180 Joules
5. / Power Provided / Maximum 660 Watt
6. / Frequency Required / 50 / 60 Hz
7. / Circuit Protection / Circuit breaker
8. / Power Device Features / Automatic voltage regulation (AVR), LED indicators, audible alarm, noise filtering
9. / Expected battery life / Minimum 2 years - maximum 5 years
10. / Warranty / Minimum 2 years
Environmental Parameters
1. / Minimum Operating Temperature / 32 oF
2. / Maximum Operating Temperature / 104 oF
3. / Humidity Operating Range : / 0 – 95%

Specify waiting period / turnaround time for the supply of UPS's.

  1. Presentation of tenders:

Tenders must be submitted in duplicate using the tender forms attached, taking into account the following :

4.1.Prices must be:

denominated in South African Rands (ZAR) and be firm and not subject to revision during the first year of performance of the contract;

offered according to the indications mentioned in the Financial Offer Submission Forms (Annex5);

calculated free of all duties, tax and dues (the European Union is exempt from all taxes and dues, including value added tax (VAT), as being a diplomatic mission the EU Delegation is exempted of them);

should include all supplies, administrative and logistical costs.

4.2.The tender must clearly indicate:

the cost per itemlisted in the Financial Submission Forms.

the deadline for delivery of the goods;

the warranty period for each item of equipment.

4.3.The tender must be signed and dated.

4.4.The forms to be filled in by the tenderer may not be altered in any way.

Submission of a tender implies that the tenderer:

accepts all the terms and conditions governing the contract in Annex to this specification;

waives its own terms and conditions.

Period of validity of the tender: at least 3 months from the deadline for the submission of tenders.

Documents to be submitted :

a)Documents constituting the financial bid (to be placed in the 'financial bid' envelope) :

Tenderers must duly complete the Financial Offer Submission forms attached to the tender specification (Annex 5);

b)Documents constituting the technical bid (to be placed in the 'technical bid' envelope) :

Tenderers must duly complete the Technical Questionnaire Submission form attached to the tender specification (Annex 6).

If any of the documents listed in point a) or b) are missing or incomplete, the tender will

be judged to not conform to the requirements and will be rejected, subject to the

application of Article148(3) of the implementing rules of the Financial Regulation

applicable to the general budget of the European Union.

  1. Award criteria and non-compliance of tenders

The contract will be awarded to the economically most advantageous tender.

5.1 Exclusion Criteria

Tenderers are requested to fill in and sign the Declaration of Honour with respect to the Exclusion Criteria and Absence of Conflict of Interest (Annex 4).

5.2 Selection Criteria

The tenders must include the following documents for the appraisal of tenderers' financial and economic standing, technical and professional competencies :

a)Tenderers' information: name of the service provider, legal status, official address, telephone number, telex and fax numbers, names and functions of the members of the management or the person authorised to sign and to represent the service provider.

b)Certificates proving legal constitution and registration of the company in South Africa.

c)Certificates issued by the authorised bodies or declarations certifying the payment of taxes and social security contributions.

5.3 Award Criteria

The contract will be awarded to the most economic offer satisfying the minimum technical requirements as described above (point 3.1 & 3.2). The tender that offers the best price (total sum of all the unit prices) will receive the maximum of 100 points. The points awarded to the other offers will be calculated as follows :

X * 100/Y, where X is the best price and Y is the price of the offer being assessed.

6. Specific contract implementation procedures

6.1 Implementation and duration of the contract

The evaluation of the offers is scheduled for the morning of the 17 March 2017.

The signature of the contract is foreseen last week ofMarch 2017.

The tender will be concluded with the signature of a one-year contract, renewable three (3) times. The total duration of the contract is limited to a maximum of four (4) years.

The Delegation of the European Union to the Republic of South Africa reserves the right to end the contract at any time, without obligation to invoke the reason for it, at a one months' notice.

7. Prices

  • Prices must be indicated in ZAR.
  • Prices must be firm and not subject to revision during the first year of performance of the contract.

7.1 Price Revision

  • At the beginning of the second year of the contract and each subsequent year, each price may be revised upwards or downwards, as laid down in Article I.5.2 of the Special Conditions and Articles II.19 of the General Conditions of the framework supply contract.

8. Terms of payment

The invoice will be paid, in South African Rands (ZAR), by transfer to the bank account designated by the company in the contract. The final payment will be executed within 30 days after reception of the invoice.

The final invoices must be sent or delivered to the

Delegation of the European Union to the Republic of South Africa,

Greenpark Estates, Building 1,

27 George Storrar Drive,

Groenkloof

or

Delegation of the European Union to the Republic of South Africa,

P.O Box 945

Groenkloof

0027

9. Costs for the tender

Costs incurred in preparing and submitting tenders are borne by the tenderers and cannot be reimbursed by the Delegation.

10. Time schedule and procedure of the tender procedure.

The deadline for sending the offers to the Delegation is 17 March @ 12h00 at the latest.

The companies interested in this tender will have to send their offersto
Delegation of the European Union to the Republic of South Africa

Mr Noël Hendrickx

Head of Administration

Building 1, Greenpark Estates

27 George Storrar Drive

Groenkloof

The evaluation of the offer will be done during the afternoon of 17 March 2017.