Creative Commons. With the exception of the Commonwealth Coat of Arms and where otherwise noted, this document is licensed under a. Creative Commons Attribution 3.0 Australia licence.
CONDITIONS REQUIRED TO BE RECORDED CONCURRENT WITHPARCEL MAP NUMBER20,806BY STAFF HEARING OFFICER CONDITIONS OF APPROVAL, RESOLUTION NO. 005-14. 128 Anacapa Street. Said approval is subject to the following conditions.
NL Master Specification Guide. for Public Funded Buildings. Re-Issued 2017/05/31 Section 23 82 33.05 Under Slab HeatersPage 1 of 3. 1Under Slab Heaters, accessories, controls and installation. 1Section 0133 00 - Submittal Procedures.
BLOCK 27 LAKELOT OWNERS ASSOCIATION. APPLICATION FOR ARCHITECTURAL CHANGE. To: Architectural Committee. c/oJerry Misiewicz. 19620 Shoreline Circle. DESCRIPTION (REQUIRED). In the area below, briefly describe (print or type) all proposed improvements.
AN ORDINANCE AMENDING THE SAN DIEGO COUNTY. ZONING ORDINANCE, MAKING PROCEDURAL CHANGES. ASSOCIATED WITH THE DISESTABLISHMENT OF THE. PLANNING AND ENVIRONMENTAL REVIEW BOARD. The Board of Supervisors of the County of San Diego ordains as follows.
Glenelg Planning Scheme. 22.03-1 Primary Industries. This policy applies to new primary industries in the Shire. The primary industries of the Shire are the major economic basis of the Shire and will continue to be so in the foreseeable future. The protection.
Henry CompanyAIR BARRIERS. Guide SpecificationSECTION 0727 00. SPEC NOTE: Henry Air-Bloc 16MR Air and Vapour Barrier. This specification is ideally suited for cavity wall construction requiring a water resistive barrier membrane which allows for the passage.
Town of Ramseur, NC. Zoning Ordinance. District Regulations. 6.1Intent of Zoning Districts. RA-40 Residential District. This district is defined as low-density residential areas of single-family dwellings and openareas where similar residential development.
Dist-County-Route), (Post Mile)Short Form - Stormwater Data Report (EA XXXXXX)(Report Month and Year. Dist-County-Route), (Post Mile)Short Form - Stormwater Data Report (EA XXXXXX)(Report Month and Year. 1.Project Description. Clearly describe the type of project and major engineering features.
To enable us to complete your energy assessment we will require. A completed checklist. Building Regulation plans with dimensions and construction notes (scale 1:100, 1:50). Window schedule (if available). Site layout and location plan showing orientation.
ABOUT CIVIL TRAIN. Civil Train is a nationally certified Registered Training Organisation (RTO), and the training division of the Civil Contractors Federation Queensland Branch (CCF QLD); the peak industry body for the civil construction industry. We.
SECTION 03 5400 SECTION 09 80 00. GYPSUM CEMENT UNDERLAYMENT. RECOMMENDED SPECIFICATION FOR DURA-CAP FLOOR UNDERLAYMENT FOR CAPPING CRACKED 1 LIGHTWEIGHT CONCRETE IN MULTIFAMILY HOUSING.
Meeting of the of Lake Success Planning Board. held in the Board Room at. 318 Lakeville Road, Great Neck, NY 11020. Ira Levine, Chairman. Elliot Browar, Deputy Chairman. Joseph Burachio. Marian Lee, alternate member. Robert Bonnie, Building Inspector. Steve Fellman, Village Architect.
HVAC in a Bottle. GeoColumn system promises smaller footprint, bigger energy savings over conventional ground-source heat pumps. Rising energy costs, global warming and rapidly improving technology are opposing forces that are conspiring, one might say.
Mitigation Conditions Revisions. General: New Hope Resource Center shall maintain and fully enforce a Code of Conduct which mitigates identified impacts pertaining to all clients/visitors, volunteers and staff, the current iteration of which is contained.
Town Manager's Report: Town Council Meeting of 11/05/2008. 1 The FYI Folder: The FYI Book contains the following items this week: READ LIST. 2. Somerset County Transition Team: The next meeting of the group which functions as a clearing house of information.