ANNEXURE – B

Terms & Conditions

for Comprehensive Annual Maintenance Contract for maintenance of Servers, Computers and Networking Components etc

1.  Vendors are advised to visit CSIR-NML and inspect the condition of the listed machines prior to submitting quotation.

2.  AMC vendor will station 2 (two) service engineers (should be a permanent employee of the vendor/on contract specifically for CSIR-NML deputed by the vendor) at NML, Jamshedpur, with at least 1(one) CCNA or MCNA or MCSE engineer. Copy of certificate to be enclosed.

Vendor selected shall ensure the following service norms:

ü  Service availability timings : 0930 hours to 1730 hours Monday to Friday & Saturday (if working day of NML)
ü  For Computers/Printers/Scanners related problems standby to be provided within 4 hours and case to be resolved within 12 hours (herein hours means office hours)
ü  For Servers/Network Switch/30KVA UPS related problems standby to be provided within 1 hours and case to be resolved within 8 hours. For other UPS/CVT related problems case to be resolved within 12 hours (herein hours means office hours).

3.  AMC vendor will ensure that operating system with necessary softwares as available in ICT-U are loaded.

4.  AMC vendor shall provide COMPREHENSIVE AMC for ALL ITEMS as in ANNEXURE-A including Networking components (Active & Passive), UPS (excluding battery) & laptops (excluding batteries) . AMC vendor will ensure that the replacement parts are the same or better configuration as that original of equipments at no extra cost to NML. In case the same make of component is obsolete, AMC vendor will replace the defective component with new one that is equivalent/better in configuration in consultation with his authorized representative.

Offers received on Non-Comprehensive AMC basis will be considered as technically unresponsive and will not be evaluated.

The obsolescence of components shall not be taken as an excuse for declaring faulty hardware “Repair Not Possible (RNP)”. In case it becomes impossible to maintain the hardware due to obsolescence of the technology, the vendor shall suitably upgrade them without any extra charge. Transportation and safety of hardware from NML site to repair centre (if required) and vice versa shall be sole responsibility of the vendor.

Page 1 of 5

5.  AMC vendor shall maintain the Passive components viz. CAT6/Fiber cables, IO boxes. Patch cords (CAT6 & Fiber), LIU patch panels (punching/ connectorization /splicing (if required) replacement with NEW passive components (if required), relaying of CAT6/Fiber cables and change the faulty cables (if required) & saddling of sagging network cables at no extra cost.

6.  Inclusion of items can be done on pro-rata basis:

(a)  During the course of AMC tenure, if a new item not in the AMC list (for those case for which warranty has expired) and needs to be included in the existing list of item under AMC, of the similar category, then a letter from NML shall be given to vendor (after any quarter) after which they have to provide maintenance for the item. The vendor can do necessary changes in their quarterly billing with a copy of letter from NML for inclusion of Items (if any).

(b) During the course of AMC tenure, if a item needs to be removed from the existing list of item under AMC, then a letter from NML shall be given to vendor (after any quarter) after which they have to amend the list and bill for the remaining items only with a copy of letter from NML for deletion of Items (if any). Deletion or addition of items should be done with information to Purchase Section. Pl. note that any deletion of item from the AMC list can only be done based on the approval of Head, ICTU and the recommendations of the Standing Disposal Committee of NML.

7.  The vendor shall provide services at NML Main Building, Burmamines, Magnesium Pilot Plant, LSTF & MBPP Plant Area / MNP Division, Agrico & Tuiladungari Dispensary & of the Director, CSIR-NML residence.

8.

8. 

9. 

10.

11.

12.

13. The vendor should have executed a single order value of such AMC job of not less than Rs.10,00,000/- (Rupees Ten Lakhs). The company should have the experience of maintaining a minimum of 500 PCs and Laptops or more with peripherals for more than three years in any Central Government Departments / Ministries/ Govt. undertakings/ Corporate offices like Tata Steel & Tata Motors along with maintenance of switched Ethernet LAN system, other than CSIR-NML Jamshedpur.

9. The vendor should have a registered office at Jamshedpur or should give an undertaking for creating an office at Jamshedpur before the conclusion of the AMC Contract.

10.Copy of Certificates to be enclosed with Quotation:

·  Certificate of vendor engineer’s CCNA or MCNA or MCSE to be posted at NML.

·  Trade license/ a certificate from your existing client that you have executed such AMC jobs having the value/volume as mentioned at Sl. No. 8 above.

·  Current work order copy issued to vendor by any Central Government Departments / Ministries/ Govt. undertakings/ Corporate offices like Tata Steel & Tata Motors maintenance of such AMC job of maintaining 500 Computers, Servers, Workstation, Printers, and Scanners including LAN system.

Page 2 of 5

11.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22. The vendor shall maintain the following Spares at NML Main Building at any time for which the necessary space would be provided by Head, ICTU :-

Items / Qty
1)  Almirah with Lock & Key / 1 No.
2)  New Branded Computer (only CPU) / 2 Nos.
3)  15” TFT Monitor / 3 Nos.
4)  B&W Laser Printer / 2 Nos.
5)  A4 Scanner / 2 No.
6)  400w SMPS / 6 Nos.
7)  SATA HDD / 3 Nos.
8)  New Keyboard & Optical Mouse / 4 Nos. each
9)  Motherboard 945 or equivalent / 2 Nos.
10)  CMOS battery / 12 Nos.
11)  24p non-SNMP switch / 2 Nos.
12)  Portable Hand Blower / 1 No.
13)  All Network detection & repairing tools / 1 set
LAN tester, Crimping, Punching & Stripping tool
14)  Tools for detection & repairing of computers & peripherals / 2 sets

12.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25. Payment will be made against invoice in four equal quarterly installments after satisfactory report duly signed by Head ICT-U & AMC coordinator, ICT-U.

13. Please provide the following details in the invoice for payment by way of e-mode.

This may please be treated as mandatory:-

i) 11 digit core Banking Account Number

ii) Type of Account (Saving/Current).

iii) Name of Account Holder.

iv) Name of Bank & Branch.

v) IFSC Code Number.

vi) MICR Number.

14.

1. 

2. 

3. 

4. 

5. 

6. 

7. 

8. 

9. 

10.

11.

12.

13.

14. E.M.D. (Earnest Money Deposit):

The bidders must submit an EMD of Rs.1,00,000/- (Rupees One Lakh only) along with the Bids in the form of Demand Draft / banker cheque of any scheduled Bank drawn in favour of the Director, National Metallurgical Laboratory payable at Jamshedpur. Bank Guarantee as per enclosed format of similar amount valid for a period of six months may also be submitted as EMD. Bids submitted without EMD will not be valid or considered. Cheques are not acceptable as EMD and the Bids submitted with cheques as EMD will be not considered. EMD of unsuccessful bidders will be returned within 3 months of finalization of AMC. However, firms registered permanently with DGS & D and NSIC who are exempted from payment of EMD will be allowed exemption. The certificate to this effect should be enclosed along with the offer, if exemption is claimed.

Page 3 of 5


15. P.B.G. (Performance Bank Guarantee):

The Successful bidder has to submit a Performance Bank Guarantee (PBG) issued by any scheduled Bank as per the format enclosed for 10 % of Order Value in favour of the Director, National Metallurgical Laboratory, Jamshedpur. The PBG should be valid for a period of two months beyond the validity of AMC Order, i.e. for 14 months. The PBG should be submitted within one month from the date of issue of order. The EMD submitted by the successful bidder will be returned soon after receipt of the PBG.

16. The Director, CSIR-National Metallurgical Laboratory, Jamshedpur reserves the right

to reject any offer or all the offers received without assigning any reason thereof.

17.Applicable Law : The contract shall be interpreted in accordance with Laws applicable in India and subject to jurisdiction of the court in Jamshedpur, Jharkhand, India only.

18.Arbitration : All disputes will be referred to Director General, Council of Scientific & Industrial Research, New Delhi for arbitration. The decision of Director General will be final and binding on both supplier and CSIR-NML, Jamshedpur.

19.Quotation to be submitted in the format given as per ANNEXURE – C. Failure to quote for any one item would lead to a technically unresponsive quote and their offer would be rejected.

20.CST/VAT – The rate of Sales Tax/VAT should be clearly indicated wherever chargeable. This office is not eligible to issue C or D forms.

21.NML is exempted from Central Excise Duty vide G.O.I. notification No. 10/97 dated 01/03/1997 & the Excise Duty Exemption Certificate may be issued against the ANC Order if required.

22.Road Permit : Declaration for Transit by Road will be provided on the written request from the vendor if required.

23.Gate Pass will be issued by the user Division/Section/Unit in whose PIR of the material exists duly endorsed by the ICTU Division of CSIR-NML, Jamshedpur if required against the maintenance contract in order to take out the items for repairing/replacement work and a copy of the same will be sent to the Stores Section (S&P Division).

24.Lightening, Mouse-Cut, Over voltage (Voltage above 250 volts certified by Electrical Department of NML) would not come under the purview of comprehensive AMC and the cost would be borne by CSIR-NML.

25.Basis of Selection :

(i) Selection of the offer will be done on the basis of lowest quoted consolidated rates/offer as per Annexure - C after taking all items into consideration.

(ii) Firms are supposed to quote for all items as per Annexure – C so that their offers can be evaluated. Failure to quote for any one item would lead to a technically unresponsive quote and their offer would be rejected.

(iii) In exceptional situations the Institute may not like to go for AMC for a particular

Page 4 of 5

item. In such situations the Decision Making Committee may decide to delete one or more items from Annexure-C and then decide the lowest technically suitable quote as per NML’s requirement.

26. It should be ensured by the vendor that the prices charged from CSIR-NML should not exceed prevailing market rates charged by the selected firm from other organizations for similar services offered.

27. Pre-mature termination of contract on unsatisfactory performance:- CSIR-NML would terminate the contract based on unsatisfactory performance of the vendor. “Unsatisfactory Performance” would mean (i) Vendor unable to provide permanent solution to a problem within 15 working days of the lodging of complaint if such instances occur more than three times in a quarter or six times in a year then termination would be effected based on the recommendation of Head, ICTU and the approval of Purchase Committee and the Advisor Management. Termination/debarring the firm from business would be effected in such cases where serviceable and performing assets of CSIR- NML have been taken by the vendor/cannibalized and returned in unserviceable form “Not Fit for Use” or subsequently not returned even after three persistent reminders then CSIR-NML would initiate termination/debarring the firm from business for the period as decided by the Director, CSIR-NML.

28. The contract can be extended beyond one year for a maximum period of six months or a minimum period of three months if the Decision Making Committee decides to call the existing lowest quoting firm for a negotiation to maintain the rates as it is as per AMC or to further lower the rates based on a market survey by the committee or on the basis of similar AMC order copies of Govt. Organizations/Corporate offices like Tata Steel/Tata Motors/Tinplate/Timken and then finalize on extension of the existing contract.

29. Negotiations if at all shall be an exception but will be conducted wherever required with the lowest evaluated responsive bidder and the Decision Making Committee would record cogent reasons for conducting a price negotiation meeting.

30.  Force Majeure:- In case of an event or situation beyond the control of the supplier that is not foreseeable, is unavoidable, and its origin is not due to negligence or lack of care on the part of the supplier. Such events like wars, revolutions, fires, floods, epidemics, quarantine restrictions, and freight embargoes, thunderstorms, lightening may be considered as not foreseeable and unavoidable by the supplier and thus the vendor can approach the force majeure committee of the Institute for redress.

31.  Annual Maintenance Contract Performance Review Committee:- It is also proposed that the contract would be reviewed for its performance every six months. Since there is a provision for extension of the contract for a further period of six months after the completion of tenure of one year thus in such circumstance any extension beyond the original tenure would be provided on the basis of the recommendations of the committee as constituted by the institute. The same committee would also look into cases of Force Majeure as mentioned above at Clause 30.

(N. K. Singh)

Stores & Purchase Officer